Coordinated Scheduling in a Two-stage Supply Chain
碩士 === 國立交通大學 === 資訊管理研究所 === 97 === In this thesis, we investigate a scheduling problem in concurrent open shops incorporating coordination among all participants. Weights are assigned to not only orders (jobs) but also product items (operations) to reflect the fact that any operations, parts or it...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Online Access: | http://ndltd.ncl.edu.tw/handle/16560280110565271726 |
id |
ndltd-TW-097NCTU5396054 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-097NCTU53960542015-10-13T15:42:31Z http://ndltd.ncl.edu.tw/handle/16560280110565271726 Coordinated Scheduling in a Two-stage Supply Chain 二階段供應鏈之協同排程 Hsieh, Hsin-Ying 謝欣穎 碩士 國立交通大學 資訊管理研究所 97 In this thesis, we investigate a scheduling problem in concurrent open shops incorporating coordination among all participants. Weights are assigned to not only orders (jobs) but also product items (operations) to reflect the fact that any operations, parts or items need to be included in the formation of objective functions and the fact that the positions of buyers and sellers may not be equal in real-world application, such as buyers' market or sellers' market. Two integer programming formulations, based on positional variables and sequencing variables, of the studied problem are presented first. We then propose a three-phase algorithm, which comprises of a WSPT heuristic, the NEH algorithm and the variable neighborhood search, to produce approximate solutions to the computationally intractable problem. Finally, we will analyze the performance of the three-phase algorithm through the computational results. Lin, Bertrand M.T. 林妙聰 學位論文 ; thesis 54 en_US |
collection |
NDLTD |
language |
en_US |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 資訊管理研究所 === 97 === In this thesis, we investigate a scheduling problem in concurrent open shops incorporating coordination among all participants. Weights are assigned to not only orders (jobs) but also product items (operations) to reflect the fact that any operations, parts or items need to be included in the formation of objective functions and the fact that the positions of buyers and sellers may not be equal in real-world application, such as buyers' market or sellers' market. Two integer programming formulations, based on positional variables and sequencing variables, of the studied problem are presented first. We then propose a three-phase algorithm, which comprises of a WSPT heuristic, the NEH algorithm and the variable neighborhood search, to produce approximate solutions to the computationally intractable problem. Finally, we will analyze the performance of the three-phase algorithm through the computational results.
|
author2 |
Lin, Bertrand M.T. |
author_facet |
Lin, Bertrand M.T. Hsieh, Hsin-Ying 謝欣穎 |
author |
Hsieh, Hsin-Ying 謝欣穎 |
spellingShingle |
Hsieh, Hsin-Ying 謝欣穎 Coordinated Scheduling in a Two-stage Supply Chain |
author_sort |
Hsieh, Hsin-Ying |
title |
Coordinated Scheduling in a Two-stage Supply Chain |
title_short |
Coordinated Scheduling in a Two-stage Supply Chain |
title_full |
Coordinated Scheduling in a Two-stage Supply Chain |
title_fullStr |
Coordinated Scheduling in a Two-stage Supply Chain |
title_full_unstemmed |
Coordinated Scheduling in a Two-stage Supply Chain |
title_sort |
coordinated scheduling in a two-stage supply chain |
url |
http://ndltd.ncl.edu.tw/handle/16560280110565271726 |
work_keys_str_mv |
AT hsiehhsinying coordinatedschedulinginatwostagesupplychain AT xièxīnyǐng coordinatedschedulinginatwostagesupplychain AT hsiehhsinying èrjiēduàngōngyīngliànzhīxiétóngpáichéng AT xièxīnyǐng èrjiēduàngōngyīngliànzhīxiétóngpáichéng |
_version_ |
1717767830072459264 |