碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 97 === Abstract In order to reduce production costs, the risk of human error and promote the efficiency of production and quality of construction, extensive use of machinery and manual made of operation technology matching has been used in most of the construction...

Full description

Bibliographic Details
Main Authors: Hsin-Chii Lee, 李新起
Other Authors: Shangyao Yan
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/10694246311060521119
id ndltd-TW-097NCU05015066
record_format oai_dc
spelling ndltd-TW-097NCU050150662016-05-02T04:10:59Z http://ndltd.ncl.edu.tw/handle/10694246311060521119 none 營建人機作業派遣最佳決策模式之研究—以油料管線鋪設工程為例 Hsin-Chii Lee 李新起 碩士 國立中央大學 土木工程學系碩士在職專班 97 Abstract In order to reduce production costs, the risk of human error and promote the efficiency of production and quality of construction, extensive use of machinery and manual made of operation technology matching has been used in most of the construction project operations of the construction works under the trend and promotion of the construction machinery automation in recent years. Due to the lack of systematic and scientific analysis of data, equipment and manpower deployment of the work of semi-automatic operation was done by the artificial experience results in the waste of machinery and human resources. It is worth to research that how to bring the science of operations management research methods into the best operator-machine work of resource scheduling. The dispatch way of buried pipeline operation made in man-machine work is viewed as the domain of the research in the construction projects. We assigned to integer linear programming as a framework for the establishment of a mathematical optimization model. Accord to the characteristics of the construction, we decided some parameter values by restricted conditions. Then we used LINGO 7.0 software package to write a computer program. The program can solve the different dispatch way about equipment, manpower and minimum cost. In order to confirm the reliability and usability of the pattern, the study takes an airport drill tubing project as model test. In comparison with the cost which obtained by artificial experience, the smallest cost which obtained by optimization model is better according to the data. This research pattern may apply in builds domain of the project pipeline work designation and change its different limiting condition or parameter value to match the framework of the study so as to get the best solution. The research demonstrates that it is feasible to establish the pattern of operation-machine work dispatch by using optimization theory and the achievement should be used in construction projects broadly. Shangyao Yan 顏上堯 2009 學位論文 ; thesis 77 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 97 === Abstract In order to reduce production costs, the risk of human error and promote the efficiency of production and quality of construction, extensive use of machinery and manual made of operation technology matching has been used in most of the construction project operations of the construction works under the trend and promotion of the construction machinery automation in recent years. Due to the lack of systematic and scientific analysis of data, equipment and manpower deployment of the work of semi-automatic operation was done by the artificial experience results in the waste of machinery and human resources. It is worth to research that how to bring the science of operations management research methods into the best operator-machine work of resource scheduling. The dispatch way of buried pipeline operation made in man-machine work is viewed as the domain of the research in the construction projects. We assigned to integer linear programming as a framework for the establishment of a mathematical optimization model. Accord to the characteristics of the construction, we decided some parameter values by restricted conditions. Then we used LINGO 7.0 software package to write a computer program. The program can solve the different dispatch way about equipment, manpower and minimum cost. In order to confirm the reliability and usability of the pattern, the study takes an airport drill tubing project as model test. In comparison with the cost which obtained by artificial experience, the smallest cost which obtained by optimization model is better according to the data. This research pattern may apply in builds domain of the project pipeline work designation and change its different limiting condition or parameter value to match the framework of the study so as to get the best solution. The research demonstrates that it is feasible to establish the pattern of operation-machine work dispatch by using optimization theory and the achievement should be used in construction projects broadly.
author2 Shangyao Yan
author_facet Shangyao Yan
Hsin-Chii Lee
李新起
author Hsin-Chii Lee
李新起
spellingShingle Hsin-Chii Lee
李新起
none
author_sort Hsin-Chii Lee
title none
title_short none
title_full none
title_fullStr none
title_full_unstemmed none
title_sort none
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/10694246311060521119
work_keys_str_mv AT hsinchiilee none
AT lǐxīnqǐ none
AT hsinchiilee yíngjiànrénjīzuòyèpàiqiǎnzuìjiājuécèmóshìzhīyánjiūyǐyóuliàoguǎnxiànpùshègōngchéngwèilì
AT lǐxīnqǐ yíngjiànrénjīzuòyèpàiqiǎnzuìjiājuécèmóshìzhīyánjiūyǐyóuliàoguǎnxiànpùshègōngchéngwèilì
_version_ 1718252919939137536