Research on Infrastructure Project Risk Management System - Example of MRT Construction Project
碩士 === 國立臺灣大學 === 土木工程學研究所 === 97 === MRT construction has been continuously developed during recent decades. Since the first construction of Green Line in the end of 1988, there was 8 different MRT Lines been completed and many Lines are now under constructing. The long history of MRT has accumulat...
Main Authors: | Yu-Fan Liu, 劉祐帆 |
---|---|
Other Authors: | 曾惠斌 |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/33004651347031566771 |
Similar Items
-
The Study of Risk Management of MRT Project in Construction Stage – The Owner’s Perspective
by: Yung-Chang Hsieh, et al.
Published: (2010) -
The Research of Disputes on Construction and Final Acceptance in MRT Project
by: Tsay-Ming, et al.
Published: (2015) -
The Inquiry of Budget Addition in Major Public Construction Projects:Take Koahsiung MRT Projects for Example
by: Chuan-Kai Chen, et al.
Published: (2004) -
The Research Of Risk Management For Application To The Constructional Engineer Project─ A case of study on MRT Xinzhuang Line
by: Ping-Ching Sung, et al.
Published: (2011) -
A Study on Priority Ranking of National Public Construction Projects-Example of Taiwan Railway MRT-type Projects for RRB-
by: Hsien-Chang Yu, et al.
Published: (2005)