Equipment Maintenance Outsourcing Strategy for DRAM Industry
碩士 === 世新大學 === 企業管理研究所(含碩專班) === 97 === Setting up a 12-inch wafer factory needs a total investment up to NT. 80 billion, nearly 90% of which is spent in the acquisition of manufacturing equipment. Regarding to the cost structure, variable costs accounted for 59.1 percent, fixed costs 40.9% (includ...
Main Authors: | Yuan-Hong Liu, 劉元鴻 |
---|---|
Other Authors: | Mei-Ya Wang |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/33578795579897229989 |
Similar Items
-
The Application of Knowledge Management in DRAM Equipment Maintenance
by: Chin-Wei Chang, et al.
Published: (2009) -
The Analysis of DRAM Monthly Price --- By DRAM Industry Analysis and PC Industry Analysis
by: YUAN-CHE , TSAI, et al.
Published: (2003) -
The Impact of Airline Aircraft Maintenance Outsourcing Strategies on the Critical Factors of Maintenance Contractors Selection
by: Chun-Yuan Cheng, et al.
Published: (2008) -
A Study of Cost Leadership Strategy in Taiwan DRAM Industry
by: Pi-Fen Liu, et al.
Published: (2009) -
A Study on the Competitive Strategies of Semiconductor Manufacturing Equipment Vendors in Taiwan’s DRAM industry - An Example of T Company
by: Hu, Shao-Chung, et al.
Published: (2011)