Railway Overhead Contact System Commission Test Study
碩士 === 國立臺北科技大學 === 電機工程系研究所 === 97 === Railway overhead contact system commission test includes pressured-electricity delivery test, interference test and short circuit interference test is implemented before the operation of the newly-built construction or reconstruction. The key of this paper is...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/a5veq7 |