The Study of Uncertainty and Scheduling Model in Building Project
博士 === 國立雲林科技大學 === 工程科技研究所博士班 === 97 === Building project is restructuring in risk causes, that existing in every project and project stages, which is the underlying main cause for most problems; that may lead to numerous schedule disruptions. This results in extremely different groups of risk fact...
Main Authors: | Min-Lan Yang, 楊閔嵐 |
---|---|
Other Authors: | Tsung-Chieh Tsai |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/64167571822313695963 |
Similar Items
-
The relationship between risk factor and scheduling uncertainty of building project
by: Chih-Ying Chen, et al.
Published: (2008) -
Evaluation Method of Risk Strategies:The Case of Project Delivery Systems
by: Ming-Lan Yang, et al.
Published: (2004) -
Schedule Planning Model for Design/Build Projects
by: Feng-Yi Guo, et al.
Published: (2005) -
Graphical scheduling algorithm for construction projects
by: Shao-Min Huang, et al.
Published: (2018) -
Resilient Scheduling as a Response to Uncertainty in Construction Projects
by: Martina Milat, et al.
Published: (2021-07-01)