Integrated Capacity Planning for IC Packaging and Final Test

博士 === 中原大學 === 工業與系統工程研究所 === 98 === Capacity planning system (CPS) considering the capacity and capability of machines as well as the capacity of kits is developed for integrated circuit (IC) packaging plants and final test plants. CPS consists of five modules: Work-In-Process (WIP) Pulling Modul...

Full description

Bibliographic Details
Main Authors: Cheng-Ju Sun, 孫正儒
Other Authors: James C. Chen
Format: Others
Language:en_US
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/jej8e5
id ndltd-TW-098CYCU5030007
record_format oai_dc
spelling ndltd-TW-098CYCU50300072019-05-15T19:39:07Z http://ndltd.ncl.edu.tw/handle/jej8e5 Integrated Capacity Planning for IC Packaging and Final Test 半導體封裝廠與最終測試廠之整合產能規劃 Cheng-Ju Sun 孫正儒 博士 中原大學 工業與系統工程研究所 98 Capacity planning system (CPS) considering the capacity and capability of machines as well as the capacity of kits is developed for integrated circuit (IC) packaging plants and final test plants. CPS consists of five modules: Work-In-Process (WIP) Pulling Module, Lot Release Module, Resource Selection Module, Workload Accumulation Module and Workload Balance Module. CPS can estimate the future loading of equipment and balance the loading of each production resource on the planning horizon. Chapter 3 and Chapter 4 show the application of CPS to IC packaging plant and final test plant, respectively. Chapter 5 develops an integrated capacity planning system for IC backend manufacturing. Chapter 6 adds Order Assignment Module to CPS and applies them to multiple backend manufacturing plants. Microsoft Visual Basic is used to develop CPS and simulation is used to evaluate its performance. The results show that CPS can effectively and efficiently balance the workload of production resources: machines, auxiliary machines and kits. James C. Chen 陳建良 2010 學位論文 ; thesis 136 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 博士 === 中原大學 === 工業與系統工程研究所 === 98 === Capacity planning system (CPS) considering the capacity and capability of machines as well as the capacity of kits is developed for integrated circuit (IC) packaging plants and final test plants. CPS consists of five modules: Work-In-Process (WIP) Pulling Module, Lot Release Module, Resource Selection Module, Workload Accumulation Module and Workload Balance Module. CPS can estimate the future loading of equipment and balance the loading of each production resource on the planning horizon. Chapter 3 and Chapter 4 show the application of CPS to IC packaging plant and final test plant, respectively. Chapter 5 develops an integrated capacity planning system for IC backend manufacturing. Chapter 6 adds Order Assignment Module to CPS and applies them to multiple backend manufacturing plants. Microsoft Visual Basic is used to develop CPS and simulation is used to evaluate its performance. The results show that CPS can effectively and efficiently balance the workload of production resources: machines, auxiliary machines and kits.
author2 James C. Chen
author_facet James C. Chen
Cheng-Ju Sun
孫正儒
author Cheng-Ju Sun
孫正儒
spellingShingle Cheng-Ju Sun
孫正儒
Integrated Capacity Planning for IC Packaging and Final Test
author_sort Cheng-Ju Sun
title Integrated Capacity Planning for IC Packaging and Final Test
title_short Integrated Capacity Planning for IC Packaging and Final Test
title_full Integrated Capacity Planning for IC Packaging and Final Test
title_fullStr Integrated Capacity Planning for IC Packaging and Final Test
title_full_unstemmed Integrated Capacity Planning for IC Packaging and Final Test
title_sort integrated capacity planning for ic packaging and final test
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/jej8e5
work_keys_str_mv AT chengjusun integratedcapacityplanningforicpackagingandfinaltest
AT sūnzhèngrú integratedcapacityplanningforicpackagingandfinaltest
AT chengjusun bàndǎotǐfēngzhuāngchǎngyǔzuìzhōngcèshìchǎngzhīzhěnghéchǎnnéngguīhuà
AT sūnzhèngrú bàndǎotǐfēngzhuāngchǎngyǔzuìzhōngcèshìchǎngzhīzhěnghéchǎnnéngguīhuà
_version_ 1719093230165819392