Deteriorating job scheduling to minimize the number of late jobs with setup times.
碩士 === 逢甲大學 === 統計與精算所 === 98 === Deteriorating jobs scheduling problems have been widely studied recently. However, research on scheduling problems with deteriorating jobs has rarely considered explicit setup time. With the current emphasis on customer service and meeting the promised delivery date...
Main Authors: | Jian-bang Lin, 林建邦 |
---|---|
Other Authors: | Wen-chiung Lee |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/09519388897216336380 |
Similar Items
-
Production Scheduling with Setup Time and Deteriorating Jobs on Flexible Job-Shop
by: Ciou, Shi-Yuan, et al.
Published: (2019) -
A single-machine scheduling problem to minimize the maximum tardiness with deteriorating jobs and setup times
by: Yi-Chi Huang, et al.
Published: (2010) -
Total completion time minimization for scheduling of two-machine flow shop with deterioration jobs and setup time
by: Ning He, et al.
Published: (2017-04-01) -
Minimizing the total weighted number of late jobs on a single-machine with group technology and deteriorating jobs
by: Zon-Syun Lu, et al.
Published: (2010) -
Minimizing the Makespan of Two-machine Flow Shop with Deteriorating Jobs and Truncated Learning Effect Setup time
by: Bo-LinSu, et al.
Published: (2014)