碩士 === 國立中興大學 === 土木工程學系所 === 98 === The bridge is one of the key roles in transportation systems. Due to the necessity of the long-span steel box bridges and the special types of bridges, the steel bridges are increasing their competitive advantages. Through the collection and comparison of the re...

Full description

Bibliographic Details
Main Authors: Chih-Hua Chang, 張志華
Other Authors: Yu-Lin Huang
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/18197774147098589183
id ndltd-TW-098NCHU5015045
record_format oai_dc
spelling ndltd-TW-098NCHU50150452016-12-25T04:10:43Z http://ndltd.ncl.edu.tw/handle/18197774147098589183 Construction Checklists and Failure Modes for Large-span Steel Box Girder Bridges by Full-span Hoisting Method 大跨徑鋼箱型梁全跨吊裝工法之自主檢查表研擬及破壞模式探討 Chih-Hua Chang 張志華 碩士 國立中興大學 土木工程學系所 98 The bridge is one of the key roles in transportation systems. Due to the necessity of the long-span steel box bridges and the special types of bridges, the steel bridges are increasing their competitive advantages. Through the collection and comparison of the relevant researches, this research offered a general introduction for a variety of bridge constructions, and then, selected the large-span steel box girder bridges by full-span hoisting method as the main object of the study. Taking "Nantou section of National Highway No. C606A 6 " as an example, the research content includes the substructure and superstructure featuring construction methods, main steps of operations and the keys to success. According to the study, the following results are offered. (1) A set of feasible construction checklists which are helpful for correctly judging the construction bottlenecks and developing measures prior to them is provided. These checklists can also increase the work efficiency and improve project quality. The checklists are developed for the reference for construction on working sites. (2) The possible failure modes and the corresponding failure loads were discussed in the study. A linear equation and figure which differentiate the bending failures from shearing failures of the bridges were provided for the reference for engineers in their designing work. Yu-Lin Huang 黃玉麟 2010 學位論文 ; thesis 142 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中興大學 === 土木工程學系所 === 98 === The bridge is one of the key roles in transportation systems. Due to the necessity of the long-span steel box bridges and the special types of bridges, the steel bridges are increasing their competitive advantages. Through the collection and comparison of the relevant researches, this research offered a general introduction for a variety of bridge constructions, and then, selected the large-span steel box girder bridges by full-span hoisting method as the main object of the study. Taking "Nantou section of National Highway No. C606A 6 " as an example, the research content includes the substructure and superstructure featuring construction methods, main steps of operations and the keys to success. According to the study, the following results are offered. (1) A set of feasible construction checklists which are helpful for correctly judging the construction bottlenecks and developing measures prior to them is provided. These checklists can also increase the work efficiency and improve project quality. The checklists are developed for the reference for construction on working sites. (2) The possible failure modes and the corresponding failure loads were discussed in the study. A linear equation and figure which differentiate the bending failures from shearing failures of the bridges were provided for the reference for engineers in their designing work.
author2 Yu-Lin Huang
author_facet Yu-Lin Huang
Chih-Hua Chang
張志華
author Chih-Hua Chang
張志華
spellingShingle Chih-Hua Chang
張志華
Construction Checklists and Failure Modes for Large-span Steel Box Girder Bridges by Full-span Hoisting Method
author_sort Chih-Hua Chang
title Construction Checklists and Failure Modes for Large-span Steel Box Girder Bridges by Full-span Hoisting Method
title_short Construction Checklists and Failure Modes for Large-span Steel Box Girder Bridges by Full-span Hoisting Method
title_full Construction Checklists and Failure Modes for Large-span Steel Box Girder Bridges by Full-span Hoisting Method
title_fullStr Construction Checklists and Failure Modes for Large-span Steel Box Girder Bridges by Full-span Hoisting Method
title_full_unstemmed Construction Checklists and Failure Modes for Large-span Steel Box Girder Bridges by Full-span Hoisting Method
title_sort construction checklists and failure modes for large-span steel box girder bridges by full-span hoisting method
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/18197774147098589183
work_keys_str_mv AT chihhuachang constructionchecklistsandfailuremodesforlargespansteelboxgirderbridgesbyfullspanhoistingmethod
AT zhāngzhìhuá constructionchecklistsandfailuremodesforlargespansteelboxgirderbridgesbyfullspanhoistingmethod
AT chihhuachang dàkuàjìnggāngxiāngxíngliángquánkuàdiàozhuānggōngfǎzhīzìzhǔjiǎnchábiǎoyánnǐjípòhuàimóshìtàntǎo
AT zhāngzhìhuá dàkuàjìnggāngxiāngxíngliángquánkuàdiàozhuānggōngfǎzhīzìzhǔjiǎnchábiǎoyánnǐjípòhuàimóshìtàntǎo
_version_ 1718405015448584192