An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem

碩士 === 國立勤益科技大學 === 電子工程系 === 98 === In recent years, the concept of scheduling has been widely applied to various applications. How to get a proper scheduling; in terms of decision-making managers has become more and more important. Most of the scheduling application problems are confirmed to be th...

Full description

Bibliographic Details
Main Authors: Ke-Ru Lin, 林珂如
Other Authors: Ruey-Maw Chen
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/43686891356119589323
id ndltd-TW-098NCIT5428007
record_format oai_dc
spelling ndltd-TW-098NCIT54280072015-10-14T04:07:13Z http://ndltd.ncl.edu.tw/handle/43686891356119589323 An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem 以模糊類神經網路分群技術求解多維度排程問題之研究 Ke-Ru Lin 林珂如 碩士 國立勤益科技大學 電子工程系 98 In recent years, the concept of scheduling has been widely applied to various applications. How to get a proper scheduling; in terms of decision-making managers has become more and more important. Most of the scheduling application problems are confirmed to be the NP-complete problems. Therefore, a variety of research methods are introduced in solving these scheduling problems, such as fuzzy logic, neural network (NN), genetic algorithm (GA), ant colony optimization (ACO) algorithm and particle swarm optimization (PSO) algorithm. Moreover, many integrations of above stated schemes are also proposed to improve the efficiency. Among them, fuzzy Hopfield neural network which integrated fuzzy c-means into Hopfield neural network to become a famous clustering method. However, most applications using FHNN are limited in solving two dimensional problems. In this work, a 2-D fuzzy Hopfield neural network (FHNN) is expanded into a three dimensional (3-D) network for solving the scheduling problems of multiprocessor scheduling problems. Restated, a processor is regarded as a cluster in multivariable scheduling problem. Moreover, three defuzzification strategies are applied and simulated; they are competition rule, roulette wheel selection rule (random-proportional rule) and pseudo-random-proportional rule. This investigation employs the suggested approach to resolve multiprocessor scheduling problems with time constrains (execution time and deadline) and no migration allowed. Simulation results illustrate that the proposed 3-D fuzzy Hopfield neural network involving proposed defuzzification strategies provides an appropriate approach for solving this class of scheduling problems effectively. Ruey-Maw Chen 陳瑞茂 2010 學位論文 ; thesis 91 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立勤益科技大學 === 電子工程系 === 98 === In recent years, the concept of scheduling has been widely applied to various applications. How to get a proper scheduling; in terms of decision-making managers has become more and more important. Most of the scheduling application problems are confirmed to be the NP-complete problems. Therefore, a variety of research methods are introduced in solving these scheduling problems, such as fuzzy logic, neural network (NN), genetic algorithm (GA), ant colony optimization (ACO) algorithm and particle swarm optimization (PSO) algorithm. Moreover, many integrations of above stated schemes are also proposed to improve the efficiency. Among them, fuzzy Hopfield neural network which integrated fuzzy c-means into Hopfield neural network to become a famous clustering method. However, most applications using FHNN are limited in solving two dimensional problems. In this work, a 2-D fuzzy Hopfield neural network (FHNN) is expanded into a three dimensional (3-D) network for solving the scheduling problems of multiprocessor scheduling problems. Restated, a processor is regarded as a cluster in multivariable scheduling problem. Moreover, three defuzzification strategies are applied and simulated; they are competition rule, roulette wheel selection rule (random-proportional rule) and pseudo-random-proportional rule. This investigation employs the suggested approach to resolve multiprocessor scheduling problems with time constrains (execution time and deadline) and no migration allowed. Simulation results illustrate that the proposed 3-D fuzzy Hopfield neural network involving proposed defuzzification strategies provides an appropriate approach for solving this class of scheduling problems effectively.
author2 Ruey-Maw Chen
author_facet Ruey-Maw Chen
Ke-Ru Lin
林珂如
author Ke-Ru Lin
林珂如
spellingShingle Ke-Ru Lin
林珂如
An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem
author_sort Ke-Ru Lin
title An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem
title_short An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem
title_full An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem
title_fullStr An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem
title_full_unstemmed An Application of 3-D Fuzzy Hopfield Neural Networks Clustering Scheme on Multidimensional Scheduling Problem
title_sort application of 3-d fuzzy hopfield neural networks clustering scheme on multidimensional scheduling problem
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/43686891356119589323
work_keys_str_mv AT kerulin anapplicationof3dfuzzyhopfieldneuralnetworksclusteringschemeonmultidimensionalschedulingproblem
AT línkērú anapplicationof3dfuzzyhopfieldneuralnetworksclusteringschemeonmultidimensionalschedulingproblem
AT kerulin yǐmóhúlèishénjīngwǎnglùfēnqúnjìshùqiújiěduōwéidùpáichéngwèntízhīyánjiū
AT línkērú yǐmóhúlèishénjīngwǎnglùfēnqúnjìshùqiújiěduōwéidùpáichéngwèntízhīyánjiū
AT kerulin applicationof3dfuzzyhopfieldneuralnetworksclusteringschemeonmultidimensionalschedulingproblem
AT línkērú applicationof3dfuzzyhopfieldneuralnetworksclusteringschemeonmultidimensionalschedulingproblem
_version_ 1718089890094120960