A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints

碩士 === 國立高雄第一科技大學 === 營建工程所 === 98 === As the electrical and mechanical (E&M) works of residential building projects in Taiwan have become increasingly complex, the contracting strategy for them is also gradually attracting attention. According to the present practice in most cases, design, proc...

Full description

Bibliographic Details
Main Authors: Yu-Lung chuang, 莊裕隆
Other Authors: Li-Chung Chao
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/54497555761573414024
id ndltd-TW-098NKIT5512007
record_format oai_dc
spelling ndltd-TW-098NKIT55120072015-10-13T13:40:00Z http://ndltd.ncl.edu.tw/handle/54497555761573414024 A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints 住宅建築機電工程發包策略之研究-從業主觀點探討 Yu-Lung chuang 莊裕隆 碩士 國立高雄第一科技大學 營建工程所 98 As the electrical and mechanical (E&M) works of residential building projects in Taiwan have become increasingly complex, the contracting strategy for them is also gradually attracting attention. According to the present practice in most cases, design, procurement, and construction are separated, i.e. the owner will complete design and procurement first and then contract out construction to contractors following certain tendering procedure in so called the traditional design/bid/build (D/B/B) model. Because the design and the construction of a project are carried out by the architect (or engineer) and the contractor separately, considerations of the designer and those of the builder may not agree with each other, which often affects job quality. In recent years, there have been some projects with E & M works completed by using the design and build (D/B) method. The objective of this study is to investigate the types of owner organization for E & M works of residential building projects, the connections between the types of owner organization and the contracting methods, and furthermore, to explore the differences in factors considered between different contracting methods, so as to provide references for decision makers. First, a questionnaire survey of industry practitioners was done and the data collected from the survey was processed and analyzed. The results show that: (1) at present, development conglomerates with a permanent project management unit mostly use the traditional contracting method and can handle more complex interfaces, whereas companies with a temporary project management unit are more likely to use the D/B method with less interface problems; (2) overall speaking, owners consider cost control most important during planning and design and consider progress control most important during construction; (3) the more an owner’s project management organization develops, the more it is able to handle interface problems, while owners with a temporary project management organization require to a greater extent the ability of a contracting method to deal with complexities; (4) using D/B can shorten project duration through concurrent design and construction, but the D/B contractor will take greater risk, and so contractor selection by the owner is especially important. Li-Chung Chao 晁立中 2010 學位論文 ; thesis 76 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄第一科技大學 === 營建工程所 === 98 === As the electrical and mechanical (E&M) works of residential building projects in Taiwan have become increasingly complex, the contracting strategy for them is also gradually attracting attention. According to the present practice in most cases, design, procurement, and construction are separated, i.e. the owner will complete design and procurement first and then contract out construction to contractors following certain tendering procedure in so called the traditional design/bid/build (D/B/B) model. Because the design and the construction of a project are carried out by the architect (or engineer) and the contractor separately, considerations of the designer and those of the builder may not agree with each other, which often affects job quality. In recent years, there have been some projects with E & M works completed by using the design and build (D/B) method. The objective of this study is to investigate the types of owner organization for E & M works of residential building projects, the connections between the types of owner organization and the contracting methods, and furthermore, to explore the differences in factors considered between different contracting methods, so as to provide references for decision makers. First, a questionnaire survey of industry practitioners was done and the data collected from the survey was processed and analyzed. The results show that: (1) at present, development conglomerates with a permanent project management unit mostly use the traditional contracting method and can handle more complex interfaces, whereas companies with a temporary project management unit are more likely to use the D/B method with less interface problems; (2) overall speaking, owners consider cost control most important during planning and design and consider progress control most important during construction; (3) the more an owner’s project management organization develops, the more it is able to handle interface problems, while owners with a temporary project management organization require to a greater extent the ability of a contracting method to deal with complexities; (4) using D/B can shorten project duration through concurrent design and construction, but the D/B contractor will take greater risk, and so contractor selection by the owner is especially important.
author2 Li-Chung Chao
author_facet Li-Chung Chao
Yu-Lung chuang
莊裕隆
author Yu-Lung chuang
莊裕隆
spellingShingle Yu-Lung chuang
莊裕隆
A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints
author_sort Yu-Lung chuang
title A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints
title_short A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints
title_full A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints
title_fullStr A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints
title_full_unstemmed A Study of Contracting Strategy for E/M Works of ResidentialBuilding - from Owners'' Viewpoints
title_sort study of contracting strategy for e/m works of residentialbuilding - from owners'' viewpoints
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/54497555761573414024
work_keys_str_mv AT yulungchuang astudyofcontractingstrategyforemworksofresidentialbuildingfromownersviewpoints
AT zhuāngyùlóng astudyofcontractingstrategyforemworksofresidentialbuildingfromownersviewpoints
AT yulungchuang zhùzháijiànzhújīdiàngōngchéngfābāocèlüèzhīyánjiūcóngyèzhǔguāndiǎntàntǎo
AT zhuāngyùlóng zhùzháijiànzhújīdiàngōngchéngfābāocèlüèzhīyánjiūcóngyèzhǔguāndiǎntàntǎo
AT yulungchuang studyofcontractingstrategyforemworksofresidentialbuildingfromownersviewpoints
AT zhuāngyùlóng studyofcontractingstrategyforemworksofresidentialbuildingfromownersviewpoints
_version_ 1717739971803086848