A study on an integrated scheduling problem of production and distribution

碩士 === 雲林科技大學 === 工業工程與管理研究所碩士班 === 98 === Production and distribution are the most important activities in supply chain. Firms can provide products that customers need at the right moment with tight integrated between production and distribution. Also, the inventory cost of both sides, firms and cu...

Full description

Bibliographic Details
Main Authors: Hsuan-an Chen, 陳璿安
Other Authors: Chin-yao Low
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/56678321959082490922
id ndltd-TW-098YUNT5031060
record_format oai_dc
spelling ndltd-TW-098YUNT50310602015-10-13T18:58:56Z http://ndltd.ncl.edu.tw/handle/56678321959082490922 A study on an integrated scheduling problem of production and distribution 整合生產與配送問題之求解模式建構 Hsuan-an Chen 陳璿安 碩士 雲林科技大學 工業工程與管理研究所碩士班 98 Production and distribution are the most important activities in supply chain. Firms can provide products that customers need at the right moment with tight integrated between production and distribution. Also, the inventory cost of both sides, firms and customers, can be lowered and the benefits of the whole supply chain can be improved. Among the past studies, production and distribution were usually studied separately. So the researcher studied a scheduling problem that integrated flow shop and vehicle routing. Genetic algorithm is a meta heuristic that searches many solutions at the same time, and it has been successfully applied to different fields since 1975. Also, hybrid genetic algorithm can be applied to both flow shop scheduling and vehicle routing problems and the outcome of solution is fine. Therefore, the researcher applied adaptive genetic algorithm to the integrated problem of production and distribution and compared the outcome of solutions with the one of genetic algorithm. The result revealed that best approximate solutions could be obtained during reasonable time and the solving outcomes of adaptive genetic algorithm was better than that of genetic algorithm. The researcher also the connection among unit inventory cost, unit distribution cost and the distribution strategy of firms. The result revealed that the orders were distributed separately under the circumstances of high inventory cost, with more cars were used to distribute orders. Chin-yao Low 駱景堯 2010 學位論文 ; thesis 96 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 雲林科技大學 === 工業工程與管理研究所碩士班 === 98 === Production and distribution are the most important activities in supply chain. Firms can provide products that customers need at the right moment with tight integrated between production and distribution. Also, the inventory cost of both sides, firms and customers, can be lowered and the benefits of the whole supply chain can be improved. Among the past studies, production and distribution were usually studied separately. So the researcher studied a scheduling problem that integrated flow shop and vehicle routing. Genetic algorithm is a meta heuristic that searches many solutions at the same time, and it has been successfully applied to different fields since 1975. Also, hybrid genetic algorithm can be applied to both flow shop scheduling and vehicle routing problems and the outcome of solution is fine. Therefore, the researcher applied adaptive genetic algorithm to the integrated problem of production and distribution and compared the outcome of solutions with the one of genetic algorithm. The result revealed that best approximate solutions could be obtained during reasonable time and the solving outcomes of adaptive genetic algorithm was better than that of genetic algorithm. The researcher also the connection among unit inventory cost, unit distribution cost and the distribution strategy of firms. The result revealed that the orders were distributed separately under the circumstances of high inventory cost, with more cars were used to distribute orders.
author2 Chin-yao Low
author_facet Chin-yao Low
Hsuan-an Chen
陳璿安
author Hsuan-an Chen
陳璿安
spellingShingle Hsuan-an Chen
陳璿安
A study on an integrated scheduling problem of production and distribution
author_sort Hsuan-an Chen
title A study on an integrated scheduling problem of production and distribution
title_short A study on an integrated scheduling problem of production and distribution
title_full A study on an integrated scheduling problem of production and distribution
title_fullStr A study on an integrated scheduling problem of production and distribution
title_full_unstemmed A study on an integrated scheduling problem of production and distribution
title_sort study on an integrated scheduling problem of production and distribution
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/56678321959082490922
work_keys_str_mv AT hsuananchen astudyonanintegratedschedulingproblemofproductionanddistribution
AT chénxuánān astudyonanintegratedschedulingproblemofproductionanddistribution
AT hsuananchen zhěnghéshēngchǎnyǔpèisòngwèntízhīqiújiěmóshìjiàngòu
AT chénxuánān zhěnghéshēngchǎnyǔpèisòngwèntízhīqiújiěmóshìjiàngòu
AT hsuananchen studyonanintegratedschedulingproblemofproductionanddistribution
AT chénxuánān studyonanintegratedschedulingproblemofproductionanddistribution
_version_ 1718039220472250368