Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project

碩士 === 元智大學 === 工業工程與管理學系 === 98 === Abstract With the intensified pressure for cost-efficiency in electronics industry, OBM (Original Brand Manufacturer) turns into inviting bids for manufacturing of new project development. Bidding invitation is an approach to discern a lowest cost from a range...

Full description

Bibliographic Details
Main Authors: Wan-Yu Chen, 陳婉玉
Other Authors: Chih-Min Fan
Format: Others
Language:en_US
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/24842832894558109739
id ndltd-TW-098YZU05031054
record_format oai_dc
spelling ndltd-TW-098YZU050310542015-10-13T18:20:43Z http://ndltd.ncl.edu.tw/handle/24842832894558109739 Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project 標案流程強化與訂價推論-以一印刷電路板組裝專業代工專案為例 Wan-Yu Chen 陳婉玉 碩士 元智大學 工業工程與管理學系 98 Abstract With the intensified pressure for cost-efficiency in electronics industry, OBM (Original Brand Manufacturer) turns into inviting bids for manufacturing of new project development. Bidding invitation is an approach to discern a lowest cost from a range of bids submitted by bidders. For a bidder, how to improve the project process effectiveness for promoting successful project rate is a critical issue to be prosperous. Top-down process controlling is the conventional approach to process management which is concentrated on the intra phase process management. Phase is the division of project process by which project stages are defined. Based on top-down approach, the inter-phase dependency is overlooked which might lead to the delay in bidding proposal. On the other hand, bidding price precision is influenced by the implicit bidding knowledge. The knowledge loss of implicit bidding experience results in the poor bidding performance. In this research, Attribute-based bottom-up process reinforcement was introduced to make analysis on current model. Attribute is the essence is the essence of document. Started from document analysis, Critical Contents are generated for process re-phasing. Besides, the objective-aligned Critical Contents are suggested to be pre-acquired for higher project effectiveness. A fuzzy-based bidding price inference model was built to assist price determining based on the predefined IF-THEN rules. IF-THEN rules are abstracted from previous success bidding projects. This inference model solves the problem of bidding knowledge loss. The error rate of discrepancy between actual bidding price and inferred price was limited to +/-5% based on this model. Keywords: PCBA OEM, bidding process reinforcement, document relevancy, bidding effectiveness, knowledge reuse, fuzzy-based bidding price inference Chih-Min Fan 范治民 2010 學位論文 ; thesis 122 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 元智大學 === 工業工程與管理學系 === 98 === Abstract With the intensified pressure for cost-efficiency in electronics industry, OBM (Original Brand Manufacturer) turns into inviting bids for manufacturing of new project development. Bidding invitation is an approach to discern a lowest cost from a range of bids submitted by bidders. For a bidder, how to improve the project process effectiveness for promoting successful project rate is a critical issue to be prosperous. Top-down process controlling is the conventional approach to process management which is concentrated on the intra phase process management. Phase is the division of project process by which project stages are defined. Based on top-down approach, the inter-phase dependency is overlooked which might lead to the delay in bidding proposal. On the other hand, bidding price precision is influenced by the implicit bidding knowledge. The knowledge loss of implicit bidding experience results in the poor bidding performance. In this research, Attribute-based bottom-up process reinforcement was introduced to make analysis on current model. Attribute is the essence is the essence of document. Started from document analysis, Critical Contents are generated for process re-phasing. Besides, the objective-aligned Critical Contents are suggested to be pre-acquired for higher project effectiveness. A fuzzy-based bidding price inference model was built to assist price determining based on the predefined IF-THEN rules. IF-THEN rules are abstracted from previous success bidding projects. This inference model solves the problem of bidding knowledge loss. The error rate of discrepancy between actual bidding price and inferred price was limited to +/-5% based on this model. Keywords: PCBA OEM, bidding process reinforcement, document relevancy, bidding effectiveness, knowledge reuse, fuzzy-based bidding price inference
author2 Chih-Min Fan
author_facet Chih-Min Fan
Wan-Yu Chen
陳婉玉
author Wan-Yu Chen
陳婉玉
spellingShingle Wan-Yu Chen
陳婉玉
Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project
author_sort Wan-Yu Chen
title Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project
title_short Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project
title_full Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project
title_fullStr Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project
title_full_unstemmed Bidding Process Reinforcement and Price Inference: An Application Case of PCBA-OEM Project
title_sort bidding process reinforcement and price inference: an application case of pcba-oem project
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/24842832894558109739
work_keys_str_mv AT wanyuchen biddingprocessreinforcementandpriceinferenceanapplicationcaseofpcbaoemproject
AT chénwǎnyù biddingprocessreinforcementandpriceinferenceanapplicationcaseofpcbaoemproject
AT wanyuchen biāoànliúchéngqiánghuàyǔdìngjiàtuīlùnyǐyīyìnshuādiànlùbǎnzǔzhuāngzhuānyèdàigōngzhuānànwèilì
AT chénwǎnyù biāoànliúchéngqiánghuàyǔdìngjiàtuīlùnyǐyīyìnshuādiànlùbǎnzǔzhuāngzhuānyèdàigōngzhuānànwèilì
_version_ 1718030073307594752