A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems
碩士 === 中華大學 === 工業管理學系碩士班 === 99 === The TOC (Theory of Constraint) Supply Chain Replenishment System (TOC-SCRS) is a replenishment method of the TOC supply chain solution and now being implemented by a growing number of companies. The performance reported by the implemented companies includes reduc...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/21090437567351505961 |
id |
ndltd-TW-099CHPI5041060 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-099CHPI50410602015-10-13T20:22:59Z http://ndltd.ncl.edu.tw/handle/21090437567351505961 A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems 限制理論供應鏈補貨機制延長 補貨頻率之問題研究 Wei-Ta, Jen 任威達 碩士 中華大學 工業管理學系碩士班 99 The TOC (Theory of Constraint) Supply Chain Replenishment System (TOC-SCRS) is a replenishment method of the TOC supply chain solution and now being implemented by a growing number of companies. The performance reported by the implemented companies includes reduction of inventory level, lead-time and transportation costs and increasing forecast accuracy and customer service levels. In application of the TOC-SCRS in a node of a supply chain, the replenishment frequency and replenishment lead time are the required parameters. Generally, the replenishment frequency of a node depends on the public transportation schedule such as ship schedules or its private conveyor schedule. If this node is a plant, however, the replenishment frequency depends on the set up frequency in this plant. However, TOC-SCRS is used in plant with capacity constraints. When product's demand is increases, it said on the bottleneck machine has more capacity demand. But the bottleneck machine's capacity is full or close, so it is difficulty of increased capacity requirements. However, this may lead to the possibility of product shortage, making the plant and supply chain will face unpredictable risks. A methodology is therefore proposed in this paper to release the inventory shortage impact for the elongated replenishment frequency in a plant. A numeric case and a sensitivity analysis are also utilized to evaluate the application of the proposed method. Employing this proposed methodology will facilitate a plant to successfully implement an effective TOC-SCRS. Horng-Huei, Wu 吳鴻輝 2011 學位論文 ; thesis 46 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中華大學 === 工業管理學系碩士班 === 99 === The TOC (Theory of Constraint) Supply Chain Replenishment System (TOC-SCRS)
is a replenishment method of the TOC supply chain solution and now being implemented
by a growing number of companies. The performance reported by the implemented
companies includes reduction of inventory level, lead-time and transportation costs and
increasing forecast accuracy and customer service levels. In application of the TOC-SCRS
in a node of a supply chain, the replenishment frequency and replenishment lead time are
the required parameters. Generally, the replenishment frequency of a node depends on the
public transportation schedule such as ship schedules or its private conveyor schedule. If
this node is a plant, however, the replenishment frequency depends on the set up frequency
in this plant. However, TOC-SCRS is used in plant with capacity constraints. When
product's demand is increases, it said on the bottleneck machine has more capacity demand.
But the bottleneck machine's capacity is full or close, so it is difficulty of increased
capacity requirements. However, this may lead to the possibility of product shortage,
making the plant and supply chain will face unpredictable risks.
A methodology is therefore proposed in this paper to release the inventory shortage
impact for the elongated replenishment frequency in a plant. A numeric case and a
sensitivity analysis are also utilized to evaluate the application of the proposed method.
Employing this proposed methodology will facilitate a plant to successfully implement
an effective TOC-SCRS.
|
author2 |
Horng-Huei, Wu |
author_facet |
Horng-Huei, Wu Wei-Ta, Jen 任威達 |
author |
Wei-Ta, Jen 任威達 |
spellingShingle |
Wei-Ta, Jen 任威達 A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems |
author_sort |
Wei-Ta, Jen |
title |
A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems |
title_short |
A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems |
title_full |
A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems |
title_fullStr |
A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems |
title_full_unstemmed |
A Study of Problems Issued by the Elongated Replenishment Frequency under TOC Supply Chain Replenishment Systems |
title_sort |
study of problems issued by the elongated replenishment frequency under toc supply chain replenishment systems |
publishDate |
2011 |
url |
http://ndltd.ncl.edu.tw/handle/21090437567351505961 |
work_keys_str_mv |
AT weitajen astudyofproblemsissuedbytheelongatedreplenishmentfrequencyundertocsupplychainreplenishmentsystems AT rènwēidá astudyofproblemsissuedbytheelongatedreplenishmentfrequencyundertocsupplychainreplenishmentsystems AT weitajen xiànzhìlǐlùngōngyīngliànbǔhuòjīzhìyánzhǎngbǔhuòpínlǜzhīwèntíyánjiū AT rènwēidá xiànzhìlǐlùngōngyīngliànbǔhuòjīzhìyánzhǎngbǔhuòpínlǜzhīwèntíyánjiū AT weitajen studyofproblemsissuedbytheelongatedreplenishmentfrequencyundertocsupplychainreplenishmentsystems AT rènwēidá studyofproblemsissuedbytheelongatedreplenishmentfrequencyundertocsupplychainreplenishmentsystems |
_version_ |
1718046237083566080 |