Planning for College Conecert Hall and Post Occupancy Evaluation (Case Study─SOOCHOW University)
碩士 === 大葉大學 === 設計暨藝術學院碩士在職專班 === 99 === Some important factors that need to be taken into account for a successful concert hall include reverberation time, background noise, wall & floor resonance, noise control thru pipe chase. During planning, design & construction phase need good control...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/96688000168497936062 |