Planning for College Conecert Hall and Post Occupancy Evaluation (Case Study─SOOCHOW University)
碩士 === 大葉大學 === 設計暨藝術學院碩士在職專班 === 99 === Some important factors that need to be taken into account for a successful concert hall include reverberation time, background noise, wall & floor resonance, noise control thru pipe chase. During planning, design & construction phase need good control...
Main Authors: | Lin,Jialu, 林佳儒 |
---|---|
Other Authors: | 黃俊熹 |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/96688000168497936062 |
Similar Items
-
The Effectiveness of the Peer-tutoring Program in the Student Residence Halls in Soochow University
by: Shu-Fang Wang, et al.
Published: (2005) -
An Analysis of the Selection of College Students' Entrance Ways - Soochow University Institutional Research
by: CHEN,YU-CHIAO, et al.
Published: (2018) -
Study of college students understanding of Green Marketing, using Soochow University as example
by: Eddy Shu-Chi Hwang, et al.
Published: (1998) -
A Usage Study on the Student Union of Soochow University
by: Jin, Ping, et al.
Published: (1996) -
Lease Dispute: Soochow University Campus Lease Disputes with the Case
by: HSIEH CHIAO HUI, et al.
Published: (2014)