Research of profit optimization for paving road asphalt concrete
碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 99 === The resources and constraints of road asphalt concrete paving projects vary from case to case. To achieve maximum returns of the costs and the goal of timely completion of projects, how to use the linear planning optimization model to obtain maximum returns...
Main Authors: | Chung-wen Sun, 孫崇文 |
---|---|
Other Authors: | Shang-yao Yan |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/59449557475909407257 |
Similar Items
-
The Study on the Effect of Porous Asphalt Concrete by Paving
by: Chih-Heng Teng, et al.
Published: (2012) -
Modeling and Simulation of Flow and Formation Damage of Asphalt-Paved Roads
by: M. H. Alawi, et al.
Published: (2013-01-01) -
The effects of laydown time and paving temperature on the viscosity of Reclaimed Asphalt Concrete
by: Wen-Yung Tzeng, et al.
Published: (2007) -
The Influence of Accelerate Cooling on The Rutting of New Paved Asphalt Concrete Pavement
by: Ueng, Gwo-Haur, et al.
Published: (1996) -
Influence of climatic conditions on the occurrence of wheel track deformation on asphalt paved roads
by: Saidakberova Iroda, et al.
Published: (2021-01-01)