Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem.

碩士 === 國立中央大學 === 土木工程研究所 === 99 === The arrangement of sports scheduling for each sport scheduling planner is a time consuming work. In this research, a constraint satisfaction problem (CSP) of Major League Baseball (MLB) scheduling with real world considerations is represented. The objective value...

Full description

Bibliographic Details
Main Authors: Cheng-yu Tsai, 蔡政諭
Other Authors: Huey-Kuo Chen
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/78517759144826432132
id ndltd-TW-099NCU05015140
record_format oai_dc
spelling ndltd-TW-099NCU050151402017-07-07T04:31:06Z http://ndltd.ncl.edu.tw/handle/78517759144826432132 Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem. 結合限制規劃法與螞蟻演算法求解運動排程問題 Cheng-yu Tsai 蔡政諭 碩士 國立中央大學 土木工程研究所 99 The arrangement of sports scheduling for each sport scheduling planner is a time consuming work. In this research, a constraint satisfaction problem (CSP) of Major League Baseball (MLB) scheduling with real world considerations is represented. The objective value of the proposed formulation is to minimize total travel distance of all teams in MLB. Since the sport scheduling problem is NP-complete, the CSP of MLB is hard to solve with consideration of rules of regulations of MLB. A combined algorithm which composed by constraint programming (CP) and ant colony system is proposed to solve the CSP of sport scheduling. Three different types of sports scheduling problem are tested by using the combined algorithm. The first one is MLB Scheduling problem, the second is Chinese Professional Baseball League Problem and the third is Belgian Soccer League scheduling. The test results show that the combined algorithm is advantageous over the current status of MLB with respect to the objective value. Huey-Kuo Chen 陳惠國 2011 學位論文 ; thesis 84 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程研究所 === 99 === The arrangement of sports scheduling for each sport scheduling planner is a time consuming work. In this research, a constraint satisfaction problem (CSP) of Major League Baseball (MLB) scheduling with real world considerations is represented. The objective value of the proposed formulation is to minimize total travel distance of all teams in MLB. Since the sport scheduling problem is NP-complete, the CSP of MLB is hard to solve with consideration of rules of regulations of MLB. A combined algorithm which composed by constraint programming (CP) and ant colony system is proposed to solve the CSP of sport scheduling. Three different types of sports scheduling problem are tested by using the combined algorithm. The first one is MLB Scheduling problem, the second is Chinese Professional Baseball League Problem and the third is Belgian Soccer League scheduling. The test results show that the combined algorithm is advantageous over the current status of MLB with respect to the objective value.
author2 Huey-Kuo Chen
author_facet Huey-Kuo Chen
Cheng-yu Tsai
蔡政諭
author Cheng-yu Tsai
蔡政諭
spellingShingle Cheng-yu Tsai
蔡政諭
Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem.
author_sort Cheng-yu Tsai
title Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem.
title_short Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem.
title_full Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem.
title_fullStr Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem.
title_full_unstemmed Combining Constraint Programming with Ant Colony Optimization to Solve Sports Scheduling Problem.
title_sort combining constraint programming with ant colony optimization to solve sports scheduling problem.
publishDate 2011
url http://ndltd.ncl.edu.tw/handle/78517759144826432132
work_keys_str_mv AT chengyutsai combiningconstraintprogrammingwithantcolonyoptimizationtosolvesportsschedulingproblem
AT càizhèngyù combiningconstraintprogrammingwithantcolonyoptimizationtosolvesportsschedulingproblem
AT chengyutsai jiéhéxiànzhìguīhuàfǎyǔmǎyǐyǎnsuànfǎqiújiěyùndòngpáichéngwèntí
AT càizhèngyù jiéhéxiànzhìguīhuàfǎyǔmǎyǐyǎnsuànfǎqiújiěyùndòngpáichéngwèntí
_version_ 1718492081099374592