A Refined Model for the Scheduling of Two Yard Cranes in a Block of Grouped Containers
碩士 === 國立東華大學 === 運籌管理研究所 === 99 === Ocean transportation becomes more important by containerization. Nowadays vessels are built much bigger as throughput of ports increases. Planners need to reduce the berthing time of vessels and improve the operational efficiency of container terminals. Conta...
Main Authors: | Hsin-Wei Huang, 黃星維 |
---|---|
Other Authors: | Yat-Wah Wan |
Format: | Others |
Language: | en_US |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/39889952735867207330 |
Similar Items
-
The Job Scheduling of Two Yard Cranes in a Container Block
by: Ying-Jyuan Liou, et al.
Published: (2008) -
The Scheduling of Multiple Yard Cranes in a Container Block by a Look-Ahead Heuristic
by: Chen-Hung Chen, et al.
Published: (2013) -
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
by: Hsien-Pin Hsu, et al.
Published: (2021-09-01) -
An Agent-Based Solution Framework for Inter-Block Yard Crane Scheduling Problems
by: Omor Sharif, et al.
Published: (2012-06-01) -
A Study of Berth Cranes Operation and Yard Blocks Assignment in the Container Port
by: Syu, Yu-Tzu, et al.
Published: (2014)