Resource allocation optimization model for landslide earthmoving operation using simulation technology
碩士 === 國立雲林科技大學 === 營建與物業管理研究所 === 99 === Because of Taiwan''s complicated environment and geology topography, mudslides are often occurred. When rainfall intensity exceeds the limit that the mountain can resist, it will lead to landslide, resulting in mountain road close. The corr...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/69816025286968750136 |
id |
ndltd-TW-099YUNT5582031 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-099YUNT55820312016-04-08T04:21:58Z http://ndltd.ncl.edu.tw/handle/69816025286968750136 Resource allocation optimization model for landslide earthmoving operation using simulation technology 運用電腦模擬技術建構坍方處理資源配置最適化模式 Chih-Min Wang 王志民 碩士 國立雲林科技大學 營建與物業管理研究所 99 Because of Taiwan''s complicated environment and geology topography, mudslides are often occurred. When rainfall intensity exceeds the limit that the mountain can resist, it will lead to landslide, resulting in mountain road close. The corresponding minor impact may threaten the local''s safety of life and property, and the major impact will cause the heavy losses of national economics. In prior experience of rapid repairing of mountain roads, repairing units often dispatch resources in accordance with decision maker’s own experience, and resource quantity is usually decided according to the ratio of landslide earthmoving volume. This decision lacks of overall consideration from all perspectives, because it results in resource idleness and cost overrun. Therefore, in order to reduce operation cost and recover the mountain road faster, this research applies computer simulation technology through a successful commercialized software SIMPROCESS to develop a novice resource allocation model for landslide removal. It allows planner to predict project duration, total cost, resource idleness, and idle cost for the project in advances. Moreover, optimization techniques are integrated into simulation model, where the optimal resource allocation action can be taken to satisfy shortest project duration or least project cost objectives. Shu-Shun Liu 劉述舜 2011 學位論文 ; thesis 89 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立雲林科技大學 === 營建與物業管理研究所 === 99 === Because of Taiwan''s complicated environment and geology topography, mudslides are often occurred. When rainfall intensity exceeds the limit that the mountain can resist, it will lead to landslide, resulting in mountain road close. The corresponding minor impact may threaten the local''s safety of life and property, and the major impact will cause the heavy losses of national economics. In prior experience of rapid repairing of mountain roads, repairing units often dispatch resources in accordance with decision maker’s own experience, and resource quantity is usually decided according to the ratio of landslide earthmoving volume. This decision lacks of overall consideration from all perspectives, because it results in resource idleness and cost overrun. Therefore, in order to reduce operation cost and recover the mountain road faster, this research applies computer simulation technology through a successful commercialized software SIMPROCESS to develop a novice resource allocation model for landslide removal. It allows planner to predict project duration, total cost, resource idleness, and idle cost for the project in advances. Moreover, optimization techniques are integrated into simulation model, where the optimal resource allocation action can be taken to satisfy shortest project duration or least project cost objectives.
|
author2 |
Shu-Shun Liu |
author_facet |
Shu-Shun Liu Chih-Min Wang 王志民 |
author |
Chih-Min Wang 王志民 |
spellingShingle |
Chih-Min Wang 王志民 Resource allocation optimization model for landslide earthmoving operation using simulation technology |
author_sort |
Chih-Min Wang |
title |
Resource allocation optimization model for landslide earthmoving operation using simulation technology |
title_short |
Resource allocation optimization model for landslide earthmoving operation using simulation technology |
title_full |
Resource allocation optimization model for landslide earthmoving operation using simulation technology |
title_fullStr |
Resource allocation optimization model for landslide earthmoving operation using simulation technology |
title_full_unstemmed |
Resource allocation optimization model for landslide earthmoving operation using simulation technology |
title_sort |
resource allocation optimization model for landslide earthmoving operation using simulation technology |
publishDate |
2011 |
url |
http://ndltd.ncl.edu.tw/handle/69816025286968750136 |
work_keys_str_mv |
AT chihminwang resourceallocationoptimizationmodelforlandslideearthmovingoperationusingsimulationtechnology AT wángzhìmín resourceallocationoptimizationmodelforlandslideearthmovingoperationusingsimulationtechnology AT chihminwang yùnyòngdiànnǎomónǐjìshùjiàngòutānfāngchùlǐzīyuánpèizhìzuìshìhuàmóshì AT wángzhìmín yùnyòngdiànnǎomónǐjìshùjiàngòutānfāngchùlǐzīyuánpèizhìzuìshìhuàmóshì |
_version_ |
1718219351457267712 |