A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company

碩士 === 中原大學 === 工業與系統工程研究所 === 100 === Semiconductor market is highly affected by globalization, and equipment products become very diverse to meet various customer requirements. Therefore, the sales forecasting for customized equipment products has become easy to have errors. While forecasting e...

Full description

Bibliographic Details
Main Authors: Ten-Xian Hsu, 徐仁憲
Other Authors: Wei-Jung Shiang
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/52945174165692623324
id ndltd-TW-100CYCU5030048
record_format oai_dc
spelling ndltd-TW-100CYCU50300482015-10-13T21:32:35Z http://ndltd.ncl.edu.tw/handle/52945174165692623324 A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company 半導體設備廠在製品拆卸重工之決策探討 Ten-Xian Hsu 徐仁憲 碩士 中原大學 工業與系統工程研究所 100 Semiconductor market is highly affected by globalization, and equipment products become very diverse to meet various customer requirements. Therefore, the sales forecasting for customized equipment products has become easy to have errors. While forecasting errors happened, such as the number was incorrect or rush order occurred, the manufacturer would consider disassembling work-in-process (WIP) of the similar products in the plant to fulfill the rush order. Although the rush order can be delivered on time in this way, the regular order might become late and the total production cost would increase. In this study, to solve inaccurate forecasting or excess demand problems, a mathematical programming model was developed to minimize total production cost for a semiconductor equipment plant. The assembly process was modeled as a flow line with four consecutive workstations, and components were assembled or disassembled in each station. This model would decide whether and how many to disassemble WIP of similar products to meet the excess demand based on the goal of minimizing the total production cost. The position of customer order decoupling points (CODPs), the penalty cost for tardiness, and delivery lead time were considered as significant factors in this model and their effects were analyzed. The minimum total cost was found with the CODP positioning after the fourth workstation and sensitivity analysis was applied to that model. Based on the results, this study found that while the CODP moved to the customer side, the disassembled number of WIP decreased. The penalty cost of rush order for tardiness has most significant effects on the total cost, and it is suggested that the disassembled number of WIP should be the decision variable. If the rush order arrives, the penalty cost for tardiness and delivery lead time are inputted into the mathematical programming model, and the disassembled number of WIP will be solved to minimize the total cost. Wei-Jung Shiang 項衛中 2012 學位論文 ; thesis 47 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中原大學 === 工業與系統工程研究所 === 100 === Semiconductor market is highly affected by globalization, and equipment products become very diverse to meet various customer requirements. Therefore, the sales forecasting for customized equipment products has become easy to have errors. While forecasting errors happened, such as the number was incorrect or rush order occurred, the manufacturer would consider disassembling work-in-process (WIP) of the similar products in the plant to fulfill the rush order. Although the rush order can be delivered on time in this way, the regular order might become late and the total production cost would increase. In this study, to solve inaccurate forecasting or excess demand problems, a mathematical programming model was developed to minimize total production cost for a semiconductor equipment plant. The assembly process was modeled as a flow line with four consecutive workstations, and components were assembled or disassembled in each station. This model would decide whether and how many to disassemble WIP of similar products to meet the excess demand based on the goal of minimizing the total production cost. The position of customer order decoupling points (CODPs), the penalty cost for tardiness, and delivery lead time were considered as significant factors in this model and their effects were analyzed. The minimum total cost was found with the CODP positioning after the fourth workstation and sensitivity analysis was applied to that model. Based on the results, this study found that while the CODP moved to the customer side, the disassembled number of WIP decreased. The penalty cost of rush order for tardiness has most significant effects on the total cost, and it is suggested that the disassembled number of WIP should be the decision variable. If the rush order arrives, the penalty cost for tardiness and delivery lead time are inputted into the mathematical programming model, and the disassembled number of WIP will be solved to minimize the total cost.
author2 Wei-Jung Shiang
author_facet Wei-Jung Shiang
Ten-Xian Hsu
徐仁憲
author Ten-Xian Hsu
徐仁憲
spellingShingle Ten-Xian Hsu
徐仁憲
A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company
author_sort Ten-Xian Hsu
title A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company
title_short A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company
title_full A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company
title_fullStr A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company
title_full_unstemmed A Study on the Decision Making of Disassembling and Reworking Work-In-Process for a Semiconductor Equipment Company
title_sort study on the decision making of disassembling and reworking work-in-process for a semiconductor equipment company
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/52945174165692623324
work_keys_str_mv AT tenxianhsu astudyonthedecisionmakingofdisassemblingandreworkingworkinprocessforasemiconductorequipmentcompany
AT xúrénxiàn astudyonthedecisionmakingofdisassemblingandreworkingworkinprocessforasemiconductorequipmentcompany
AT tenxianhsu bàndǎotǐshèbèichǎngzàizhìpǐnchāixièzhònggōngzhījuécètàntǎo
AT xúrénxiàn bàndǎotǐshèbèichǎngzàizhìpǐnchāixièzhònggōngzhījuécètàntǎo
AT tenxianhsu studyonthedecisionmakingofdisassemblingandreworkingworkinprocessforasemiconductorequipmentcompany
AT xúrénxiàn studyonthedecisionmakingofdisassemblingandreworkingworkinprocessforasemiconductorequipmentcompany
_version_ 1718065132623364096