An Order Suggestion System with Optimizing Alternatives Based on WIP and NSGA-II
碩士 === 國立高雄第一科技大學 === 系統資訊與控制研究所 === 100 === An IC supplier often suffers from problems of high levels of outsourcing inventory and obsolete materials. The problems are caused from that, due to long wafer manufacturing time, the IC supplier increases extra production buffer time and safety inventory...
Main Authors: | Yi-chin Yang, 楊懿秦 |
---|---|
Other Authors: | Haw-ching Yang |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/99894253345416553556 |
Similar Items
-
Optimization of Wheel Reprofiling Based on the Improved NSGA-II
by: Xinghu Wang, et al.
Published: (2020-01-01) -
Parameterization of NSGA-II for the Optimal Design of Water Distribution Systems
by: Qi Wang, et al.
Published: (2019-05-01) -
Towards Evaluation of the Adaptive-Epsilon-R-NSGA-II algorithm (AE-R-NSGA-II) on industrial optimization problems
by: Kashfi, S. Ruhollah
Published: (2015) -
Value stream mapping and WIP and lead time optimization for a make-to-order system
by: Sudhir, Priyanka Ram
Published: (2009) -
E-NSGA-II for machining process parameters optimization
by: Yusoff, Yusliza
Published: (2012)