A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans

碩士 === 國立臺灣大學 === 建築與城鄉研究所 === 100 === To enable post-disaster reconstruction plans to be helpful for reconstruction work, this study focuses on 921 earthquake township reconstruction master plans in Wufeng Township , Dali City, and Guoxing Township, analyzing four aspects including the method of i...

Full description

Bibliographic Details
Main Authors: Yun-Chun Lai, 賴昀君
Other Authors: 陳亮全
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/jvrnm6
id ndltd-TW-100NTU05225031
record_format oai_dc
spelling ndltd-TW-100NTU052250312018-04-10T17:21:57Z http://ndltd.ncl.edu.tw/handle/jvrnm6 A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans 大規模災害災後重建計畫擬定與執行之探討—以九二一震災鄉鎮市重建綱要計畫三個案為例 Yun-Chun Lai 賴昀君 碩士 國立臺灣大學 建築與城鄉研究所 100 To enable post-disaster reconstruction plans to be helpful for reconstruction work, this study focuses on 921 earthquake township reconstruction master plans in Wufeng Township , Dali City, and Guoxing Township, analyzing four aspects including the method of investigation on elementary data, the channel for public participation, the operation of township organization, and the allocation and execution of restitution and recovery programs. Through analyzing and comparing the executive results of these township reconstruction master plans using various manipulation models, the study also reviews the frame of township reconstruction master plans, the evaluation method in enabling the reconstruction work by Executive Yuan Resurrection Committee as well as their views and experiences in planning and executing these reconstruction master plans in the hopes of providing some directions for future post-reconstruction plan-making. In this study, it is found that firstly, detailed disaster damage survey could help the reconstruction plans to be processed in a more proactive way, and analysis of second-hand data gained from some urban planning cases that were planned and reviewed in peacetime is also helpful for rapidly and appropriately making up reconstruction vision and programs. Secondly, the communication mechanism building up among the professional planning team, reconstruction committee, and the public contributes to the three parties in terms of setting up a common goal, reaching a consensus, and forming the local cohesion as well as initiative spirit. Thirdly, the dominant role of township organization in planning and executing reconstruction plans could be established through the assistance from other organizations and clear principles of reconstruction funding. Lastly, clear regulations and operating principles for reconstruction plans could help the reconstruction plans to be more pragmatic and feasible. 陳亮全 2012 學位論文 ; thesis 117 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 建築與城鄉研究所 === 100 === To enable post-disaster reconstruction plans to be helpful for reconstruction work, this study focuses on 921 earthquake township reconstruction master plans in Wufeng Township , Dali City, and Guoxing Township, analyzing four aspects including the method of investigation on elementary data, the channel for public participation, the operation of township organization, and the allocation and execution of restitution and recovery programs. Through analyzing and comparing the executive results of these township reconstruction master plans using various manipulation models, the study also reviews the frame of township reconstruction master plans, the evaluation method in enabling the reconstruction work by Executive Yuan Resurrection Committee as well as their views and experiences in planning and executing these reconstruction master plans in the hopes of providing some directions for future post-reconstruction plan-making. In this study, it is found that firstly, detailed disaster damage survey could help the reconstruction plans to be processed in a more proactive way, and analysis of second-hand data gained from some urban planning cases that were planned and reviewed in peacetime is also helpful for rapidly and appropriately making up reconstruction vision and programs. Secondly, the communication mechanism building up among the professional planning team, reconstruction committee, and the public contributes to the three parties in terms of setting up a common goal, reaching a consensus, and forming the local cohesion as well as initiative spirit. Thirdly, the dominant role of township organization in planning and executing reconstruction plans could be established through the assistance from other organizations and clear principles of reconstruction funding. Lastly, clear regulations and operating principles for reconstruction plans could help the reconstruction plans to be more pragmatic and feasible.
author2 陳亮全
author_facet 陳亮全
Yun-Chun Lai
賴昀君
author Yun-Chun Lai
賴昀君
spellingShingle Yun-Chun Lai
賴昀君
A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans
author_sort Yun-Chun Lai
title A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans
title_short A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans
title_full A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans
title_fullStr A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans
title_full_unstemmed A Study on Planning and Executing Post-Disaster Reconstruction Plan after Major Disaster — A Case Study of Three 921 Earthquake Township Reconstruction Master Plans
title_sort study on planning and executing post-disaster reconstruction plan after major disaster — a case study of three 921 earthquake township reconstruction master plans
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/jvrnm6
work_keys_str_mv AT yunchunlai astudyonplanningandexecutingpostdisasterreconstructionplanaftermajordisasteracasestudyofthree921earthquaketownshipreconstructionmasterplans
AT làiyúnjūn astudyonplanningandexecutingpostdisasterreconstructionplanaftermajordisasteracasestudyofthree921earthquaketownshipreconstructionmasterplans
AT yunchunlai dàguīmózāihàizāihòuzhòngjiànjìhuànǐdìngyǔzhíxíngzhītàntǎoyǐjiǔèryīzhènzāixiāngzhènshìzhòngjiàngāngyàojìhuàsāngèànwèilì
AT làiyúnjūn dàguīmózāihàizāihòuzhòngjiànjìhuànǐdìngyǔzhíxíngzhītàntǎoyǐjiǔèryīzhènzāixiāngzhènshìzhòngjiàngāngyàojìhuàsāngèànwèilì
AT yunchunlai studyonplanningandexecutingpostdisasterreconstructionplanaftermajordisasteracasestudyofthree921earthquaketownshipreconstructionmasterplans
AT làiyúnjūn studyonplanningandexecutingpostdisasterreconstructionplanaftermajordisasteracasestudyofthree921earthquaketownshipreconstructionmasterplans
_version_ 1718626722113388544