Denitrifying Sulfide Removal with Granule Sludge

碩士 === 國立臺灣科技大學 === 化學工程系 === 100 === Effect of sulfide and nitrate on both Denitrifying Sulfide Removal (DSR) process and methanogenic activity in batch assays using granule sludge and effect of Hydraulic Retention Time (HRT) on sulfide removal in anaerobic DSR process with continuous UASB using gr...

Full description

Bibliographic Details
Main Author: Juliananda
Other Authors: Duu-Jong Lee
Format: Others
Language:en_US
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/a4etfn
id ndltd-TW-100NTUS5342099
record_format oai_dc
spelling ndltd-TW-100NTUS53420992019-05-15T20:51:12Z http://ndltd.ncl.edu.tw/handle/a4etfn Denitrifying Sulfide Removal with Granule Sludge 顆粒污泥反硝化硫化物去除 Juliananda Juliananda 碩士 國立臺灣科技大學 化學工程系 100 Effect of sulfide and nitrate on both Denitrifying Sulfide Removal (DSR) process and methanogenic activity in batch assays using granule sludge and effect of Hydraulic Retention Time (HRT) on sulfide removal in anaerobic DSR process with continuous UASB using granule sludge investigated here. The highest level of sulfide 400 mg S/L with 500 mg N/L can be removed after 8 h and nitrate was completely consumed after 21 h. However, addition of nitrate to methanogenic culture resulting in a lag time of methane production which increased as increasing concentration of nitrate. Both nitrate and sulfide addition seriously inhibits methanogenesis. HRT of 12 hours has better performance compared to HRT of 1 day on sulfide removal. All sulfides was decreased to 9.75 mg S/L after 12 hours and kept stable below 10 mg S/L. Duu-Jong Lee Duu-Jong Lee 2012 學位論文 ; thesis 60 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 化學工程系 === 100 === Effect of sulfide and nitrate on both Denitrifying Sulfide Removal (DSR) process and methanogenic activity in batch assays using granule sludge and effect of Hydraulic Retention Time (HRT) on sulfide removal in anaerobic DSR process with continuous UASB using granule sludge investigated here. The highest level of sulfide 400 mg S/L with 500 mg N/L can be removed after 8 h and nitrate was completely consumed after 21 h. However, addition of nitrate to methanogenic culture resulting in a lag time of methane production which increased as increasing concentration of nitrate. Both nitrate and sulfide addition seriously inhibits methanogenesis. HRT of 12 hours has better performance compared to HRT of 1 day on sulfide removal. All sulfides was decreased to 9.75 mg S/L after 12 hours and kept stable below 10 mg S/L.
author2 Duu-Jong Lee
author_facet Duu-Jong Lee
Juliananda
Juliananda
author Juliananda
Juliananda
spellingShingle Juliananda
Juliananda
Denitrifying Sulfide Removal with Granule Sludge
author_sort Juliananda
title Denitrifying Sulfide Removal with Granule Sludge
title_short Denitrifying Sulfide Removal with Granule Sludge
title_full Denitrifying Sulfide Removal with Granule Sludge
title_fullStr Denitrifying Sulfide Removal with Granule Sludge
title_full_unstemmed Denitrifying Sulfide Removal with Granule Sludge
title_sort denitrifying sulfide removal with granule sludge
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/a4etfn
work_keys_str_mv AT juliananda denitrifyingsulfideremovalwithgranulesludge
AT juliananda denitrifyingsulfideremovalwithgranulesludge
AT juliananda kēlìwūnífǎnxiāohuàliúhuàwùqùchú
AT juliananda kēlìwūnífǎnxiāohuàliúhuàwùqùchú
_version_ 1719104624791650304