Developing BIM Revision Management Model and System in Construction

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 100 === The application of BIM (Building Information Modeling) has become the most critical and useful tool for construction management during the construction phase of construction project. BIM revision management has become the most critical management strategy in...

Full description

Bibliographic Details
Main Authors: Hsin-Wei Chou, 周信緯
Other Authors: Yu-Cheng Lin
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/6dgyus
Description
Summary:碩士 === 國立臺北科技大學 === 土木與防災研究所 === 100 === The application of BIM (Building Information Modeling) has become the most critical and useful tool for construction management during the construction phase of construction project. BIM revision management has become the most critical management strategy in construction management. However, it is difficult for users to recognize the change information of BIM models in the different versions. In order to improve the above problem, this study proposes a practical model and system to compare and identify change information between original BIM model and revised BIM model for BIM revision management. Using proposed model and system, users can get an overview of previous and current change BIM-based information and take appropriate advanced revision management. Furthermore, the proposed model and system applied in selected cases study of a building project in Taiwan to demonstrate the effectiveness of BIM application special in BIM management. The tested results demonstrate that proposed model and system could be an effective tool for BIM revision management for the project participants during the construction phase.