A Flow Shop Scheduling Problem with Resource Flexibility and Unrelated Parallel-Machine Consideration
碩士 === 國立雲林科技大學 === 工業工程與管理研究所碩士班 === 100 === This paper focuses on the flow shop scheduling with unrelated parallel machine and resource flexibility consideration, the processing time of each job may be reduced linearly by using of resource on unrelated parallel machine and sum of resource which ea...
Main Authors: | Chen-wei Liu, 劉鎮瑋 |
---|---|
Other Authors: | Chinyao Low |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/76307821342102130220 |
Similar Items
-
An Approach of Unrelated Parallel-Machine Flow Shop Scheduling Problems with Constrained Resources
by: Chien-ming Chen, et al.
Published: (2009) -
Literature Review on the Hybrid Flow Shop Scheduling Problem with Unrelated Parallel Machines
by: Eliana Marcela Peña Tibaduiza, et al.
Published: (2017-01-01) -
An Approach of Blocking Flow Shop Scheduling with Unrelated Parallel Machine
by: Ching-Kuo Lin, et al.
Published: (2007) -
An Approach of No Wait Flow Shop Scheduling with Unrelated Parallel Machine
by: wu hsien ming, et al.
Published: (2007) -
Applications of Genetic Algorithm to Optimize Unrelated Parallel Machines of Flexible Job-shop Scheduling Problem
by: Hung-Te Tsai, et al.
Published: (2013)