Order acceptance and scheduling of single machine in make-to-order systems

碩士 === 國立雲林科技大學 === 工業工程與管理研究所碩士班 === 100 === In make-to-order production systems, facing the influx of a large number of orders exceeds its load capacity, the manufacturers will give up some orders to fulfill the capacity requirement. Therefore, the order acceptance has become an important issue. M...

Full description

Bibliographic Details
Main Authors: Yu-Chi Huang, 黃宥錡
Other Authors: Chin-Yao Low
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/50337959720810943244
id ndltd-TW-100YUNT5031074
record_format oai_dc
spelling ndltd-TW-100YUNT50310742015-10-13T21:55:45Z http://ndltd.ncl.edu.tw/handle/50337959720810943244 Order acceptance and scheduling of single machine in make-to-order systems 訂單式生產單機環境下訂單選擇與排程規劃 Yu-Chi Huang 黃宥錡 碩士 國立雲林科技大學 工業工程與管理研究所碩士班 100 In make-to-order production systems, facing the influx of a large number of orders exceeds its load capacity, the manufacturers will give up some orders to fulfill the capacity requirement. Therefore, the order acceptance has become an important issue. Manufacturers must consider the levels of customers, the delivery time and benefits of each order to decide which orders to accept and what orders to give up based on their corresponding capacity to work out a reasonable scheduling project. Therefore, this study investigates the single-machine scheduling problems in make-to-order systems, and all orders divided into three levels based on the importance of customers. Different level of orders has some scheduling restrictions, and affects the decisions to accept or give up orders. Some constraints such as a sequence-dependent setup time, release time and distinct due window are considered for each order. For each order, early completion will increase the holding cost, and delay in delivery will increase penalty as well; meanwhile, all orders must be completed before the deadline requirement. The objective is to meet the maximum the total profit of the system. Constructed mathematical models can effectively solve our problem, but only for small size problems. The ISFAN, and the ISFAN + TS algorithms, both get excellent solution quality in this study. The ISFAN + TS under the variety of environments, the solution quality are better than ISFAN, and under the due date is more concentrated environment, but also can play the advantages of the solution. Finally, the overall improvement rate is 1.31%. Chin-Yao Low 駱景堯 2012 學位論文 ; thesis 55 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立雲林科技大學 === 工業工程與管理研究所碩士班 === 100 === In make-to-order production systems, facing the influx of a large number of orders exceeds its load capacity, the manufacturers will give up some orders to fulfill the capacity requirement. Therefore, the order acceptance has become an important issue. Manufacturers must consider the levels of customers, the delivery time and benefits of each order to decide which orders to accept and what orders to give up based on their corresponding capacity to work out a reasonable scheduling project. Therefore, this study investigates the single-machine scheduling problems in make-to-order systems, and all orders divided into three levels based on the importance of customers. Different level of orders has some scheduling restrictions, and affects the decisions to accept or give up orders. Some constraints such as a sequence-dependent setup time, release time and distinct due window are considered for each order. For each order, early completion will increase the holding cost, and delay in delivery will increase penalty as well; meanwhile, all orders must be completed before the deadline requirement. The objective is to meet the maximum the total profit of the system. Constructed mathematical models can effectively solve our problem, but only for small size problems. The ISFAN, and the ISFAN + TS algorithms, both get excellent solution quality in this study. The ISFAN + TS under the variety of environments, the solution quality are better than ISFAN, and under the due date is more concentrated environment, but also can play the advantages of the solution. Finally, the overall improvement rate is 1.31%.
author2 Chin-Yao Low
author_facet Chin-Yao Low
Yu-Chi Huang
黃宥錡
author Yu-Chi Huang
黃宥錡
spellingShingle Yu-Chi Huang
黃宥錡
Order acceptance and scheduling of single machine in make-to-order systems
author_sort Yu-Chi Huang
title Order acceptance and scheduling of single machine in make-to-order systems
title_short Order acceptance and scheduling of single machine in make-to-order systems
title_full Order acceptance and scheduling of single machine in make-to-order systems
title_fullStr Order acceptance and scheduling of single machine in make-to-order systems
title_full_unstemmed Order acceptance and scheduling of single machine in make-to-order systems
title_sort order acceptance and scheduling of single machine in make-to-order systems
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/50337959720810943244
work_keys_str_mv AT yuchihuang orderacceptanceandschedulingofsinglemachineinmaketoordersystems
AT huángyòuqí orderacceptanceandschedulingofsinglemachineinmaketoordersystems
AT yuchihuang dìngdānshìshēngchǎndānjīhuánjìngxiàdìngdānxuǎnzéyǔpáichéngguīhuà
AT huángyòuqí dìngdānshìshēngchǎndānjīhuánjìngxiàdìngdānxuǎnzéyǔpáichéngguīhuà
_version_ 1718070112816201728