The Scheduling of Multiple Yard Cranes in a Container Block by a Look-Ahead Heuristic
碩士 === 國立東華大學 === 運籌管理研究所 === 101 === Ocean transportation has tremendous growth. The throughput of each port increases, and the competition of among ports become fierce. In order to attract customers, ports enhance the efficiency of container processing. Yard cranes are the most important factor...
Main Authors: | Chen-Hung Chen, 陳竑成 |
---|---|
Other Authors: | Yat-Wah Wan |
Format: | Others |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/92631519766073503871 |
Similar Items
-
The Job Scheduling of Two Yard Cranes in a Container Block
by: Ying-Jyuan Liou, et al.
Published: (2008) -
A Refined Model for the Scheduling of Two Yard Cranes in a Block of Grouped Containers
by: Hsin-Wei Huang, et al.
Published: (2011) -
A Heuristic Algorithm for Solving the Pre-marshalling Problem of Container Yard with Two Gantry Cranes
by: Tien-WeiLan, et al.
Published: (2019) -
An Agent-Based Solution Framework for Inter-Block Yard Crane Scheduling Problems
by: Omor Sharif, et al.
Published: (2012-06-01) -
A Study of Berth Cranes Operation and Yard Blocks Assignment in the Container Port
by: Syu, Yu-Tzu, et al.
Published: (2014)