Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study

碩士 === 國立臺灣科技大學 === 營建工程系 === 101 === Taiwan's terrain is varied by the mountains and rivers. Therefore, part of the traffic bottleneck sections need to rely on bridges and the contribution of bridges to national economic developments is big. However, the cost of building a new bridge is im...

Full description

Bibliographic Details
Main Authors: Tzyy-Yun Huang, 黃子毓
Other Authors: none
Format: Others
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/39285677227918074868
id ndltd-TW-101NTUS5512078
record_format oai_dc
spelling ndltd-TW-101NTUS55120782016-03-21T04:28:03Z http://ndltd.ncl.edu.tw/handle/39285677227918074868 Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study 應用演化式最小平方差支持向量機推論模式(ELSIM)推估橋梁興建成本-以新北市為例 Tzyy-Yun Huang 黃子毓 碩士 國立臺灣科技大學 營建工程系 101 Taiwan's terrain is varied by the mountains and rivers. Therefore, part of the traffic bottleneck sections need to rely on bridges and the contribution of bridges to national economic developments is big. However, the cost of building a new bridge is immense, takes up a large proportion of local government budget. If reasonably calculates construction costs, it can reduce the waste of public affairs budget and ease the financial burden.. Ministry of Transport has established the database for completed bridges in Taiwan (Taiwan Bridge Management Information Systems). If uses data wisely, compare and organize useful information in order to calculate the reasonable cost for constructing bridges and exchange information, which can effectively reduce the unnecessary waste for all departments. This research collects Xinbei city bridge basic information as the construction cost factor, and applying statistical software (SPSS) for influencing factors, objectively pick out cost factor which affects bridge construction as the model input parameters, learning from the previous cases and experiences then train from Evolutionary Least Squares Support Vector Machine Inference Model (ELSIM) to identify the relationship of inputs (factors affecting construction costs) and output (cost), summed up the experts’ decision making process and the logic of analysis. In order to verify the accuracy of the construction cost estimation model, besides ELSIM model tests, this study also compares to other artificial intelligence programs (SVM and ESIM). ELSIM gets the best final confirmed result. According to the result, builds up the bridges construction cost prediction mode, to establish a "bridge construction cost estimation model", to support decision maker’s conduct. none 鄭明淵 2013 學位論文 ; thesis 132 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 營建工程系 === 101 === Taiwan's terrain is varied by the mountains and rivers. Therefore, part of the traffic bottleneck sections need to rely on bridges and the contribution of bridges to national economic developments is big. However, the cost of building a new bridge is immense, takes up a large proportion of local government budget. If reasonably calculates construction costs, it can reduce the waste of public affairs budget and ease the financial burden.. Ministry of Transport has established the database for completed bridges in Taiwan (Taiwan Bridge Management Information Systems). If uses data wisely, compare and organize useful information in order to calculate the reasonable cost for constructing bridges and exchange information, which can effectively reduce the unnecessary waste for all departments. This research collects Xinbei city bridge basic information as the construction cost factor, and applying statistical software (SPSS) for influencing factors, objectively pick out cost factor which affects bridge construction as the model input parameters, learning from the previous cases and experiences then train from Evolutionary Least Squares Support Vector Machine Inference Model (ELSIM) to identify the relationship of inputs (factors affecting construction costs) and output (cost), summed up the experts’ decision making process and the logic of analysis. In order to verify the accuracy of the construction cost estimation model, besides ELSIM model tests, this study also compares to other artificial intelligence programs (SVM and ESIM). ELSIM gets the best final confirmed result. According to the result, builds up the bridges construction cost prediction mode, to establish a "bridge construction cost estimation model", to support decision maker’s conduct.
author2 none
author_facet none
Tzyy-Yun Huang
黃子毓
author Tzyy-Yun Huang
黃子毓
spellingShingle Tzyy-Yun Huang
黃子毓
Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study
author_sort Tzyy-Yun Huang
title Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study
title_short Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study
title_full Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study
title_fullStr Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study
title_full_unstemmed Estimate Cost of Bridge Construction Using Evolutionary Least Squares Support Vector Machine Inference Model(ELSIM) - New Taipei City Case Study
title_sort estimate cost of bridge construction using evolutionary least squares support vector machine inference model(elsim) - new taipei city case study
publishDate 2013
url http://ndltd.ncl.edu.tw/handle/39285677227918074868
work_keys_str_mv AT tzyyyunhuang estimatecostofbridgeconstructionusingevolutionaryleastsquaressupportvectormachineinferencemodelelsimnewtaipeicitycasestudy
AT huángziyù estimatecostofbridgeconstructionusingevolutionaryleastsquaressupportvectormachineinferencemodelelsimnewtaipeicitycasestudy
AT tzyyyunhuang yīngyòngyǎnhuàshìzuìxiǎopíngfāngchàzhīchíxiàngliàngjītuīlùnmóshìelsimtuīgūqiáoliángxìngjiànchéngběnyǐxīnběishìwèilì
AT huángziyù yīngyòngyǎnhuàshìzuìxiǎopíngfāngchàzhīchíxiàngliàngjītuīlùnmóshìelsimtuīgūqiáoliángxìngjiànchéngběnyǐxīnběishìwèilì
_version_ 1718209903725641728