A study on the difference of project resource leveling based on free float and total float of project activities
碩士 === 國立臺北科技大學 === 經營管理系碩士班 === 101 === The three major factors in the project management are scheduling, costing and resources. Among them, resource is the most important factor. Critical Path Method and Program Evaluation and Review Technique only consider “Time-only Information”. This causes...
Main Authors: | Yi-Jiun Chen, 陳怡君 |
---|---|
Other Authors: | 林逾先 |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/zpzash |
Similar Items
-
Resource Constrained Project Scheduling – Heuristic of Total and Free Float Time Priority
by: Sheng-Yen Yu, et al.
Published: (2007) -
Float-Based Resource Leveling Optimization of Linear Projects
by: Ziteng Wang, et al.
Published: (2020-01-01) -
Floating Time Consumption Impacts On Multi-Project Resource Constrained Scheduling
by: Tai-Lin Chen, et al.
Published: (2012) -
Dynamic Floating Image Projection
by: Yang, I-Ying, et al.
Published: (2016) -
Interactive Floating Image Projection System
by: Yong-Xian Zheng, et al.
Published: (2014)