Selection in Pile Foundation and Well Foundation

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 101 === In C903 of Freeway NO.1 widening project Wugu-Yangmei section, the bridges were constructed along the hillside. It will take several months to excavate and retain by traditional procedure. The working place between the Freeway NO.1 and Ta-Ke-Keng Stream is ve...

Full description

Bibliographic Details
Main Authors: Chao Cheng Changchien, 張簡昭澄
Other Authors: 陳水龍
Format: Others
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/s3t824
Description
Summary:碩士 === 國立臺北科技大學 === 土木與防災研究所 === 101 === In C903 of Freeway NO.1 widening project Wugu-Yangmei section, the bridges were constructed along the hillside. It will take several months to excavate and retain by traditional procedure. The working place between the Freeway NO.1 and Ta-Ke-Keng Stream is very narrow, and the hillside along the freeway is on steep slope. The feasibility analysis of selection from pile foundation of original design changing to well foundation is needed. When well foundation is constructed, the excavation area is small, the building equipment is small, and it has well efficiency. It is suitable for bridge foundation along hillside. These two foundations will be compared and evaluated from construction, environmental protection, shorten construction period, and landscape maintenance