Developing Dynamic Scheduling Model for Earthmoving Operation from the Perspective of RCPSP
碩士 === 國立雲林科技大學 === 營建與物業管理研究所 === 101 === In a construction project, how to save costs and shorten duration of project often becomes the crucial consideration as a whole, while handling issue in the earthworks is another basic key. Currently, the typical volume of the earthworks in the project was...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/43661000420912890002 |