A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example

碩士 === 國立中興大學 === 高階經理人碩士在職專班 === 102 === There are numerous types of Hand Tool. They can be classified by the use of power into two main sections: Power Tool and Non-power Tool. In which Power tools can be further sorted into Electric Tool and Pneumatic Tool. This article will be focused on Pneumat...

Full description

Bibliographic Details
Main Authors: Liang-Ho Chen, 陳良和
Other Authors: 謝焸君
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/8w7ww6
id ndltd-TW-102NCHU0457010
record_format oai_dc
spelling ndltd-TW-102NCHU04570102019-05-15T22:53:47Z http://ndltd.ncl.edu.tw/handle/8w7ww6 A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example 運用精實生產系統縮短交期之研究-以手工具生產製造為例 Liang-Ho Chen 陳良和 碩士 國立中興大學 高階經理人碩士在職專班 102 There are numerous types of Hand Tool. They can be classified by the use of power into two main sections: Power Tool and Non-power Tool. In which Power tools can be further sorted into Electric Tool and Pneumatic Tool. This article will be focused on Pneumatic Tool. Pneumatic Tool has been developing in Taiwan for a period of time. It has gone through the golden ages to industrial transformation. It had taken the path to emigrate to China, and the competition between countries has become severe. Therefore the product requires upgrade and the production efficiency to be improved timely. Quality, Cost and Delivery is the three most significant matters that any enterprise needs to seek for profit and growth, to remain competitive. When an industry faces transformation and upgrade, Quality is its first priority, following by delivery and cost. This research is aimed to shorten the time between receiving order and completing delivery by applying tools and methods in the Lean production system. Attitude and efficiency of work in every process should be reformed, and the time cost to deliver the goods can be improved. Up to the end of 2012, it takes average 45 to 55 days for the example company to deliver their goods. In this research, the goal is to reach the delivery period within 30 to 35 days. 謝焸君 2014 學位論文 ; thesis 49 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中興大學 === 高階經理人碩士在職專班 === 102 === There are numerous types of Hand Tool. They can be classified by the use of power into two main sections: Power Tool and Non-power Tool. In which Power tools can be further sorted into Electric Tool and Pneumatic Tool. This article will be focused on Pneumatic Tool. Pneumatic Tool has been developing in Taiwan for a period of time. It has gone through the golden ages to industrial transformation. It had taken the path to emigrate to China, and the competition between countries has become severe. Therefore the product requires upgrade and the production efficiency to be improved timely. Quality, Cost and Delivery is the three most significant matters that any enterprise needs to seek for profit and growth, to remain competitive. When an industry faces transformation and upgrade, Quality is its first priority, following by delivery and cost. This research is aimed to shorten the time between receiving order and completing delivery by applying tools and methods in the Lean production system. Attitude and efficiency of work in every process should be reformed, and the time cost to deliver the goods can be improved. Up to the end of 2012, it takes average 45 to 55 days for the example company to deliver their goods. In this research, the goal is to reach the delivery period within 30 to 35 days.
author2 謝焸君
author_facet 謝焸君
Liang-Ho Chen
陳良和
author Liang-Ho Chen
陳良和
spellingShingle Liang-Ho Chen
陳良和
A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example
author_sort Liang-Ho Chen
title A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example
title_short A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example
title_full A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example
title_fullStr A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example
title_full_unstemmed A Study of Using Lean Production System to Shorten the Delivery Period – Hand Tool Manufacturing as an Example
title_sort study of using lean production system to shorten the delivery period – hand tool manufacturing as an example
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/8w7ww6
work_keys_str_mv AT lianghochen astudyofusingleanproductionsystemtoshortenthedeliveryperiodhandtoolmanufacturingasanexample
AT chénliánghé astudyofusingleanproductionsystemtoshortenthedeliveryperiodhandtoolmanufacturingasanexample
AT lianghochen yùnyòngjīngshíshēngchǎnxìtǒngsuōduǎnjiāoqīzhīyánjiūyǐshǒugōngjùshēngchǎnzhìzàowèilì
AT chénliánghé yùnyòngjīngshíshēngchǎnxìtǒngsuōduǎnjiāoqīzhīyánjiūyǐshǒugōngjùshēngchǎnzhìzàowèilì
AT lianghochen studyofusingleanproductionsystemtoshortenthedeliveryperiodhandtoolmanufacturingasanexample
AT chénliánghé studyofusingleanproductionsystemtoshortenthedeliveryperiodhandtoolmanufacturingasanexample
_version_ 1719136203119263744