Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty

碩士 === 國立成功大學 === 工業與資訊管理學系 === 102 === This paper proposes an integrated economic production quantity (EPQ) model to determine the optimal production run-time and production lot-sizing under a minimal free-repair warranty (FRW) policy. It advocates a strategic preventive maintenance (PM) plan...

Full description

Bibliographic Details
Main Authors: Yu-YuanSu, 蘇裕淵
Other Authors: Chin-Ho Lin
Format: Others
Language:en_US
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/93511081173187928693
id ndltd-TW-102NCKU5041055
record_format oai_dc
spelling ndltd-TW-102NCKU50410552016-03-07T04:10:56Z http://ndltd.ncl.edu.tw/handle/93511081173187928693 Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty 考量不完美生產製程與保養政策於生產具保固產品之經濟生產批量模式 Yu-YuanSu 蘇裕淵 碩士 國立成功大學 工業與資訊管理學系 102 This paper proposes an integrated economic production quantity (EPQ) model to determine the optimal production run-time and production lot-sizing under a minimal free-repair warranty (FRW) policy. It advocates a strategic preventive maintenance (PM) plan for an imperfect production process following a deterioration distribution with an increasing failure rate (IFR). It is assumed that the production system begins in the in-control state that produces items with high or perfect quality. Over time, the production process may deteriorate to the point to which non-conforming items are fabricated. The probability of non-conforming items being produced is thus taken into account to identify the time at which the process is in the out-of-control state. Furthermore, instead of using an inspection policy which monitors the process, a warranty policy for products sold is considered which includes the concept of the inspection cost in order to reduce the inspection time during the process. This model can be used for products sold within the warranty period, which follows a failure distribution. In this case, the warranty cost to service non-conforming items is much greater than the cost to service conforming items, so the EPQ model controls the proportion of non-conforming items produced through lot sizing, resulting in a reduction in the warranty cost. In brief, minimal repair, PM, rework and warranty policy are considered in the model. An inventory shortage may occur during the PM, which is also considered as the shortage cost. The objective of this paper is to obtain the optimal production run-length which minimizes the expected total cost per cycle. A numerical example is provided to illustrate the effect of changes in the various parameters on the optimal solution. A sensitivity analysis and the Taguchi method are applied to the EPQ model with respect to the key parameters. Chin-Ho Lin 林清河 2014 學位論文 ; thesis 51 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 工業與資訊管理學系 === 102 === This paper proposes an integrated economic production quantity (EPQ) model to determine the optimal production run-time and production lot-sizing under a minimal free-repair warranty (FRW) policy. It advocates a strategic preventive maintenance (PM) plan for an imperfect production process following a deterioration distribution with an increasing failure rate (IFR). It is assumed that the production system begins in the in-control state that produces items with high or perfect quality. Over time, the production process may deteriorate to the point to which non-conforming items are fabricated. The probability of non-conforming items being produced is thus taken into account to identify the time at which the process is in the out-of-control state. Furthermore, instead of using an inspection policy which monitors the process, a warranty policy for products sold is considered which includes the concept of the inspection cost in order to reduce the inspection time during the process. This model can be used for products sold within the warranty period, which follows a failure distribution. In this case, the warranty cost to service non-conforming items is much greater than the cost to service conforming items, so the EPQ model controls the proportion of non-conforming items produced through lot sizing, resulting in a reduction in the warranty cost. In brief, minimal repair, PM, rework and warranty policy are considered in the model. An inventory shortage may occur during the PM, which is also considered as the shortage cost. The objective of this paper is to obtain the optimal production run-length which minimizes the expected total cost per cycle. A numerical example is provided to illustrate the effect of changes in the various parameters on the optimal solution. A sensitivity analysis and the Taguchi method are applied to the EPQ model with respect to the key parameters.
author2 Chin-Ho Lin
author_facet Chin-Ho Lin
Yu-YuanSu
蘇裕淵
author Yu-YuanSu
蘇裕淵
spellingShingle Yu-YuanSu
蘇裕淵
Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty
author_sort Yu-YuanSu
title Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty
title_short Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty
title_full Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty
title_fullStr Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty
title_full_unstemmed Economic Production Quantity Model with Imperfect Process and Preventive Maintenance for Products Sold with Warranty
title_sort economic production quantity model with imperfect process and preventive maintenance for products sold with warranty
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/93511081173187928693
work_keys_str_mv AT yuyuansu economicproductionquantitymodelwithimperfectprocessandpreventivemaintenanceforproductssoldwithwarranty
AT sūyùyuān economicproductionquantitymodelwithimperfectprocessandpreventivemaintenanceforproductssoldwithwarranty
AT yuyuansu kǎoliàngbùwánměishēngchǎnzhìchéngyǔbǎoyǎngzhèngcèyúshēngchǎnjùbǎogùchǎnpǐnzhījīngjìshēngchǎnpīliàngmóshì
AT sūyùyuān kǎoliàngbùwánměishēngchǎnzhìchéngyǔbǎoyǎngzhèngcèyúshēngchǎnjùbǎogùchǎnpǐnzhījīngjìshēngchǎnpīliàngmóshì
_version_ 1718198954423746560