A study of the collapse of Lin-bien river bridge railway during Typhoon Morakot
碩士 === 國立成功大學 === 水利及海洋工程學系碩士在職專班 === 102 === Lin-bian River bridge railway was built in 1941 and began to operate in the same year. During Typhoon Morakot, piers P11, P12 and three girders of the bridge were damaged by the flood on Aug 8, 2009, before the embankment broke. Typhoon Morakot produced...
Main Authors: | Chang-HsunOu, 歐長訓 |
---|---|
Other Authors: | Chin-Kun Huang |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/39259224264189624034 |
Similar Items
-
Sediment Accumulation Simulation of Lin-Ban Creek Levee Broke by Typhoon Morakot.
by: Chang, Cheng-hsiao, et al.
Published: (2014) -
River channel accumulation and change at Laonong river during the Typhoon Morakot
by: Yu-Ting Huang, et al.
Published: (2013) -
An Invesigate Reasons Leding to the Bridge DamageDuring Typhoon Morakot –A case study of the bridges across Kao-Ping river
by: 吳孟洪
Published: (2010) -
Vulnerability Factors of Bridges Damaged by Typhoon Morakot and Mechanisms of Bridge Management and Maintenance
by: Chia-hsien Lu, et al.
Published: (2010) -
Simulating the Rainfall Hyetograph of Alishan During Typhoon Morakot
by: Yu-JiaJheng, et al.
Published: (2019)