Implementation of Narrow-band PLC System and Analog Front End Based on G3 Specification
碩士 === 國立成功大學 === 電腦與通信工程研究所 === 102 === This thesis implements the power-line communication systems with hardware components and simulates power-line communication systems with software. Compare the implementation and simulation results with each other and design the analog front-end circuit after...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/98a3f7 |