Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry

碩士 === 國立臺灣科技大學 === 工業管理系 === 102 === This case study investigated on Aeronautical Engine Industry, under the unstable demand and highly competition. It is interesting to understand the factors for not only growing the annual sales 7 times, from $5.5M in 2005 to $36M in 2008, but also increasing th...

Full description

Bibliographic Details
Main Authors: Yu-Teng Hsu, 許友騰
Other Authors: Kung-Jeng Wang
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/ptdf5t
id ndltd-TW-102NTUS5041115
record_format oai_dc
spelling ndltd-TW-102NTUS50411152019-05-15T21:33:11Z http://ndltd.ncl.edu.tw/handle/ptdf5t Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry 精實生產與管理之實踐-以飛機引擎維修業為例 Yu-Teng Hsu 許友騰 碩士 國立臺灣科技大學 工業管理系 102 This case study investigated on Aeronautical Engine Industry, under the unstable demand and highly competition. It is interesting to understand the factors for not only growing the annual sales 7 times, from $5.5M in 2005 to $36M in 2008, but also increasing the Earning-Before-Income-Tax (EBIT) to a remarkable 48% when facing external challenges such as global economy recession, unstable market demand and strong competition. Because of customers’ requirement and unstable market demand as well as enhancing competitiveness by lower operational cost and higher quality in addition to the compliance with airworthiness, the continuous improvement actions have been initiated led by the ACE management system. Two transformations of production lines are studied. First case: the production line of HPC variable vane inner shroud was developed in response to the issue of in-flight-shut-down of old type engine before 2004. In addition to the significant reduction of market demand of old type engine, case company was challenged to increase the yield rate of new production line together with the issues of decreasing customer satisfaction, on-time delivery and picking up of COPQ. Second case: the production line of HPC RCC was developed and successfully responded not only to retain but also to grow the new product sales through reviewing both internal and external performance indices based on ACE implementation experience. Two case studies are provided as reference when introducing ACE management into business entities as well as when establishing other lean management into different industries so that readers can understand both implementation process and result verification. Kung-Jeng Wang 王孔政 2014 學位論文 ; thesis 68 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 工業管理系 === 102 === This case study investigated on Aeronautical Engine Industry, under the unstable demand and highly competition. It is interesting to understand the factors for not only growing the annual sales 7 times, from $5.5M in 2005 to $36M in 2008, but also increasing the Earning-Before-Income-Tax (EBIT) to a remarkable 48% when facing external challenges such as global economy recession, unstable market demand and strong competition. Because of customers’ requirement and unstable market demand as well as enhancing competitiveness by lower operational cost and higher quality in addition to the compliance with airworthiness, the continuous improvement actions have been initiated led by the ACE management system. Two transformations of production lines are studied. First case: the production line of HPC variable vane inner shroud was developed in response to the issue of in-flight-shut-down of old type engine before 2004. In addition to the significant reduction of market demand of old type engine, case company was challenged to increase the yield rate of new production line together with the issues of decreasing customer satisfaction, on-time delivery and picking up of COPQ. Second case: the production line of HPC RCC was developed and successfully responded not only to retain but also to grow the new product sales through reviewing both internal and external performance indices based on ACE implementation experience. Two case studies are provided as reference when introducing ACE management into business entities as well as when establishing other lean management into different industries so that readers can understand both implementation process and result verification.
author2 Kung-Jeng Wang
author_facet Kung-Jeng Wang
Yu-Teng Hsu
許友騰
author Yu-Teng Hsu
許友騰
spellingShingle Yu-Teng Hsu
許友騰
Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry
author_sort Yu-Teng Hsu
title Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry
title_short Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry
title_full Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry
title_fullStr Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry
title_full_unstemmed Practice of Lean Production and Management-A Case Study for Aeronautical Engine Industry
title_sort practice of lean production and management-a case study for aeronautical engine industry
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/ptdf5t
work_keys_str_mv AT yutenghsu practiceofleanproductionandmanagementacasestudyforaeronauticalengineindustry
AT xǔyǒuténg practiceofleanproductionandmanagementacasestudyforaeronauticalengineindustry
AT yutenghsu jīngshíshēngchǎnyǔguǎnlǐzhīshíjiànyǐfēijīyǐnqíngwéixiūyèwèilì
AT xǔyǒuténg jīngshíshēngchǎnyǔguǎnlǐzhīshíjiànyǐfēijīyǐnqíngwéixiūyèwèilì
_version_ 1719117001819947008