OPTIMAL REPAIR SEQUENCE OF FAULTS FOR DISTRIBUTION SYSTEM AFTER A TYPHOON
碩士 === 大同大學 === 電機工程學系(所) === 102 === Typhoons often cause significant damages to the distribution system, and result in a lot of customer blackouts. Due to the limited human resources of power company, it is necessary to figure out the optimal repair sequence for multi-fault distribution system to...
Main Authors: | Hsing-Chiang Wang, 王幸強 |
---|---|
Other Authors: | Wen-chen Chu |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/67brdt |
Similar Items
-
An optimization model of power emergency repair path under typhoon disaster
by: Shaohua Zhu, et al.
Published: (2021-04-01) -
Analysis of Typhoon Wind Speed Profile in Taiwan Area
by: Lin, Yu-Chiang, et al.
Published: (2017) -
GPS Surface Deformation of The Southwestern Taiwan During The 2009 Morakot Typhoon Period
by: Hsing-chunTsai, et al.
Published: (2011) -
ESTIMATING TYPHOON QUANTITATIVE PRECIPITATION BY USING AMSU MICROWAVE DATA
by: Yung-Chiang Chen,, et al.
Published: (2004) -
Xiaolin Elementary School after Typhoon Morakot - A Case Study
by: Wang Chen Shu, et al.
Published: (2013)