none

碩士 === 國立中央大學 === 土木工程學系在職專班 === 103 === In recent years, with the continuous development of high-tech industry and constant advancement of process technologies, the new processes and new chemicals used in the semi-conductor plants are getting more complicated and dangerous. Thus, the safety and hea...

Full description

Bibliographic Details
Main Authors: Zheng-zhe Liu, 劉政哲
Other Authors: Shang-yao Yan
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/vw89kj
id ndltd-TW-103NCU05015039
record_format oai_dc
spelling ndltd-TW-103NCU050150392019-05-15T22:08:27Z http://ndltd.ncl.edu.tw/handle/vw89kj none 緊急應變組織ERT人員排班最佳化模式之研究 Zheng-zhe Liu 劉政哲 碩士 國立中央大學 土木工程學系在職專班 103 In recent years, with the continuous development of high-tech industry and constant advancement of process technologies, the new processes and new chemicals used in the semi-conductor plants are getting more complicated and dangerous. Thus, the safety and health operation management and emergency response of the unexpected accident in the plant require more manpower and resource to guarantee the safety in the plant area and reduce the probability of the unexpected disaster and accident occurrence. That is why the Emergency Response Team (ERT) is set up in the plant to respond to the disaster and accident, and perform first-aid and the related operations. Besides guaranteeing the plant safety and preventing the unexpected disasters and accidents, the attendance of ERT members will also indirectly affect their working efficiency and disaster recovery operation in the safety maintenance. Currently the ERT members work in three shifts system. Moreover, the semi-conductor plants are mostly in 24-hour operation. In terms of the manpower assignment, the managers mostly make decision based on the experience, and carry out manual scheduling operation. This deficient method fails to achieve the fair principle, and consumes much time in operation. For above issues, the study takes a semi-conductor plant located in Hsinchu Science Park as an example, by which the model developed in the study is proven to be reasonable and practical. It constructs a mathematic optimization model and calculates solution by using LINGO-9.0 software package. In this way, it works out the most even attendance schedule and manpower assignment optimization for the ERT members. The study results show the model developed in the study is more efficient than the manual assignment based on experience, which also achieves the fairness in the attendance schedule. It can provide reference for the high-tech plants in the practice of ERT manpower assignment. Shang-yao Yan 顏上堯 2015 學位論文 ; thesis 66 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程學系在職專班 === 103 === In recent years, with the continuous development of high-tech industry and constant advancement of process technologies, the new processes and new chemicals used in the semi-conductor plants are getting more complicated and dangerous. Thus, the safety and health operation management and emergency response of the unexpected accident in the plant require more manpower and resource to guarantee the safety in the plant area and reduce the probability of the unexpected disaster and accident occurrence. That is why the Emergency Response Team (ERT) is set up in the plant to respond to the disaster and accident, and perform first-aid and the related operations. Besides guaranteeing the plant safety and preventing the unexpected disasters and accidents, the attendance of ERT members will also indirectly affect their working efficiency and disaster recovery operation in the safety maintenance. Currently the ERT members work in three shifts system. Moreover, the semi-conductor plants are mostly in 24-hour operation. In terms of the manpower assignment, the managers mostly make decision based on the experience, and carry out manual scheduling operation. This deficient method fails to achieve the fair principle, and consumes much time in operation. For above issues, the study takes a semi-conductor plant located in Hsinchu Science Park as an example, by which the model developed in the study is proven to be reasonable and practical. It constructs a mathematic optimization model and calculates solution by using LINGO-9.0 software package. In this way, it works out the most even attendance schedule and manpower assignment optimization for the ERT members. The study results show the model developed in the study is more efficient than the manual assignment based on experience, which also achieves the fairness in the attendance schedule. It can provide reference for the high-tech plants in the practice of ERT manpower assignment.
author2 Shang-yao Yan
author_facet Shang-yao Yan
Zheng-zhe Liu
劉政哲
author Zheng-zhe Liu
劉政哲
spellingShingle Zheng-zhe Liu
劉政哲
none
author_sort Zheng-zhe Liu
title none
title_short none
title_full none
title_fullStr none
title_full_unstemmed none
title_sort none
publishDate 2015
url http://ndltd.ncl.edu.tw/handle/vw89kj
work_keys_str_mv AT zhengzheliu none
AT liúzhèngzhé none
AT zhengzheliu jǐnjíyīngbiànzǔzhīertrényuánpáibānzuìjiāhuàmóshìzhīyánjiū
AT liúzhèngzhé jǐnjíyīngbiànzǔzhīertrényuánpáibānzuìjiāhuàmóshìzhīyánjiū
_version_ 1719126330756300800