Investigation of Land Subsidence at the Intersection of Provincial Highway 78 and High Speed Rail
碩士 === 國立嘉義大學 === 土木與水資源工程學系研究所 === 103 === The biggest worries about driving safety are the embankment subsidence since Taiwan High Speed Rail (THSR) started transportation and service. On March 7, 2011, the location of the most serious subsidence problem occurred at the cross section along the THS...
Main Authors: | Feng-Yi Dai, 戴鳳儀 |
---|---|
Other Authors: | Wen-Juinn Chen Ph.D. |
Format: | Others |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/32284667304545991986 |
Similar Items
-
Monitoring and Analysis of Ground Subsidence at the Intersection Area of Expressway 78 and High Speed Rail of Taiwan
by: LIN, CHIA-YI, et al.
Published: (2018) -
Analysis on Subsidence Monitoring and Influence Factors at Intersection of Expressway 78 and High Speed Rail of Taiwan
by: HUANG,I-NING, et al.
Published: (2019) -
Alluvial Sand Compression Testing and Ground Subsidence Monitoring at the Intersection of Expressway 78 and High Speed Rail of Taiwan
by: CHUANG,CHAI-FENG, et al.
Published: (2017) -
High-speed rail – highway 2.0?
by: Pavel Krupík
Published: (2021-07-01) -
Discussion on Groundwater Conservation Strategy for Land Subsidence:Area along the Yunlin High-Speed Rail
by: Jyun-WeiZeng, et al.
Published: (2019)