Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example

碩士 === 國立屏東科技大學 === 水土保持系所 === 103 === In the past, Taiwan had ignored and neglected the environmental, ecological and landscaping problems arising from road development. In terms of highway development, since the cost of design is determined on the basis of mileage, potential rockfall, landslide, d...

Full description

Bibliographic Details
Main Authors: Shao, Hsien-Hung, 邵獻弘
Other Authors: 李錦育
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/34zycr
id ndltd-TW-103NPUS5080001
record_format oai_dc
spelling ndltd-TW-103NPUS50800012019-05-15T22:26:35Z http://ndltd.ncl.edu.tw/handle/34zycr Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example 山區道路改線評估方法之研究―以台九線457k+651渡月橋為例 Shao, Hsien-Hung 邵獻弘 碩士 國立屏東科技大學 水土保持系所 103 In the past, Taiwan had ignored and neglected the environmental, ecological and landscaping problems arising from road development. In terms of highway development, since the cost of design is determined on the basis of mileage, potential rockfall, landslide, debris flow, soil conservation, landscaping and ecological problems were usually overlooked because of insufficient budget or the designer’s routinism. In terms of construction, conventional construction method usually cut into mountains by drilling and explosion, which often loosened the soil, causing landslide and rockfall; dumping waste soil at discretion also caused serious damage to the landscape and environment. Highway route selection aims at identifying the safest, most convenient, economic, easy-to-maintain corridor that meets the design standard for road construction. In this study, the 457k+651 Duyue Bridge on Provincial Highway No. 9 are taken as examples. The bridge is located in Shihzih Township of Pingtung County. In addition to the wriggly and winding line of the existing road, these old bridges fall short of the requirement of the “Specification of the highway route design”. While these bridges are rebuilt, it is hoped that the road line in that area would be improved. 李錦育 2014 學位論文 ; thesis 68 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立屏東科技大學 === 水土保持系所 === 103 === In the past, Taiwan had ignored and neglected the environmental, ecological and landscaping problems arising from road development. In terms of highway development, since the cost of design is determined on the basis of mileage, potential rockfall, landslide, debris flow, soil conservation, landscaping and ecological problems were usually overlooked because of insufficient budget or the designer’s routinism. In terms of construction, conventional construction method usually cut into mountains by drilling and explosion, which often loosened the soil, causing landslide and rockfall; dumping waste soil at discretion also caused serious damage to the landscape and environment. Highway route selection aims at identifying the safest, most convenient, economic, easy-to-maintain corridor that meets the design standard for road construction. In this study, the 457k+651 Duyue Bridge on Provincial Highway No. 9 are taken as examples. The bridge is located in Shihzih Township of Pingtung County. In addition to the wriggly and winding line of the existing road, these old bridges fall short of the requirement of the “Specification of the highway route design”. While these bridges are rebuilt, it is hoped that the road line in that area would be improved.
author2 李錦育
author_facet 李錦育
Shao, Hsien-Hung
邵獻弘
author Shao, Hsien-Hung
邵獻弘
spellingShingle Shao, Hsien-Hung
邵獻弘
Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example
author_sort Shao, Hsien-Hung
title Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example
title_short Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example
title_full Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example
title_fullStr Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example
title_full_unstemmed Study on the Evaluation Method of Mountain Road Rerouting-Taking 457k+651 Duyue Bridge on Provincial Highway No. 9 for Example
title_sort study on the evaluation method of mountain road rerouting-taking 457k+651 duyue bridge on provincial highway no. 9 for example
publishDate 2014
url http://ndltd.ncl.edu.tw/handle/34zycr
work_keys_str_mv AT shaohsienhung studyontheevaluationmethodofmountainroadreroutingtaking457k651duyuebridgeonprovincialhighwayno9forexample
AT shàoxiànhóng studyontheevaluationmethodofmountainroadreroutingtaking457k651duyuebridgeonprovincialhighwayno9forexample
AT shaohsienhung shānqūdàolùgǎixiànpínggūfāngfǎzhīyánjiūyǐtáijiǔxiàn457k651dùyuèqiáowèilì
AT shàoxiànhóng shānqūdàolùgǎixiànpínggūfāngfǎzhīyánjiūyǐtáijiǔxiàn457k651dùyuèqiáowèilì
_version_ 1719131182182957056