Study On Key Success Factors for the Cost-Plus Construction Contract-Lesson Learned from Private Construction Project
碩士 === 國立臺灣大學 === 土木工程學研究所 === 103 === Cost-plus contract for construction projects cannot be widely adopted because there are issues of information asymmetry and mutual trust usually existed between the owners and contractors. To solve information asymmetry problem of the cost-plus contract, th...
Main Authors: | Chin-Chien Hsu, 許進乾 |
---|---|
Other Authors: | Hui-Ping Tserng |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/ndpbx7 |
Similar Items
-
Application of Cost-Plus-Fixed-Fee Contracts in Expressway Construction Supervision Projects
by: Chou, Jong-Yeuan, et al.
Published: (2013) -
Selection of contract type in construction contracts: Lump-Sum, Target-cost and Cost-plus contracts
by: Sancho Calderón, Diego
Published: (2017) -
A Study on the Termination of Public Construction Contracts – Using Project Re-Contracting as an Example
by: Feng-Chin Hsu, et al.
Published: (2016) -
The Key Success Factors of Construction Project Managers
by: Yeh, Ching-Chang, et al.
Published: (2008) -
Identify Decision Factors of Cost-plus Constractingfor Construction Projects
by: Wei-Ning Chen, et al.
Published: (2012)