Preliminary Study of Systematic Assessment of Construction Interfaces
碩士 === 國立臺灣科技大學 === 營建工程系 === 103 === Whether a project can be completed successfully or not, relies on one of the decisive factors, the proper project management. Whether a project can be properly managed, depends on the interface solution management. Past project management interface solutions cou...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/67271533541677226645 |
id |
ndltd-TW-103NTUS5512010 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-103NTUS55120102017-01-07T04:08:43Z http://ndltd.ncl.edu.tw/handle/67271533541677226645 Preliminary Study of Systematic Assessment of Construction Interfaces 工程管理界面問題系統化評估初探 CHEN, MIN-CHENG 陳敏正 碩士 國立臺灣科技大學 營建工程系 103 Whether a project can be completed successfully or not, relies on one of the decisive factors, the proper project management. Whether a project can be properly managed, depends on the interface solution management. Past project management interface solutions count on professional personnel and their own knowledge, experience, and background, but lacking of a systematic approach to assess the interface problem. Theory of Inventive Problem Solving (TRIZ) can assist project management interface problems to be categorized systemically and transformed into standard problems. Then use the contradiction matrix to get conceptual standard answers, and ultimately the conceptual standard answers apply to solve the project management interface problems. When adopting TRIZ to categorize the project management interface problems into standard systematic problems, the problems cannot be converted from the original TRIZ parameters successfully. It is because project management interface problems contain the interfaces between people and objects, therefore the original parameters of TRIZ (aim to objects) can not perform favorably. For solving project management interface problems, this study will analyze the TRIZ parameters appliance on “people” and establish the parameters subjected to people, hoping to assist top management solving the interface problems in a systemic thinking direction. Sou-Sen Leu 呂守陞 2015 學位論文 ; thesis 202 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 營建工程系 === 103 === Whether a project can be completed successfully or not, relies on one of the decisive factors, the proper project management. Whether a project can be properly managed, depends on the interface solution management. Past project management interface solutions count on professional personnel and their own knowledge, experience, and background, but lacking of a systematic approach to assess the interface problem.
Theory of Inventive Problem Solving (TRIZ) can assist project management interface problems to be categorized systemically and transformed into standard problems. Then use the contradiction matrix to get conceptual standard answers, and ultimately the conceptual standard answers apply to solve the project management interface problems. When adopting TRIZ to categorize the project management interface problems into standard systematic problems, the problems cannot be converted from the original TRIZ parameters successfully. It is because project management interface problems contain the interfaces between people and objects, therefore the original parameters of TRIZ (aim to objects) can not perform favorably.
For solving project management interface problems, this study will analyze the TRIZ parameters appliance on “people” and establish the parameters subjected to people, hoping to assist top management solving the interface problems in a systemic thinking direction.
|
author2 |
Sou-Sen Leu |
author_facet |
Sou-Sen Leu CHEN, MIN-CHENG 陳敏正 |
author |
CHEN, MIN-CHENG 陳敏正 |
spellingShingle |
CHEN, MIN-CHENG 陳敏正 Preliminary Study of Systematic Assessment of Construction Interfaces |
author_sort |
CHEN, MIN-CHENG |
title |
Preliminary Study of Systematic Assessment of Construction Interfaces |
title_short |
Preliminary Study of Systematic Assessment of Construction Interfaces |
title_full |
Preliminary Study of Systematic Assessment of Construction Interfaces |
title_fullStr |
Preliminary Study of Systematic Assessment of Construction Interfaces |
title_full_unstemmed |
Preliminary Study of Systematic Assessment of Construction Interfaces |
title_sort |
preliminary study of systematic assessment of construction interfaces |
publishDate |
2015 |
url |
http://ndltd.ncl.edu.tw/handle/67271533541677226645 |
work_keys_str_mv |
AT chenmincheng preliminarystudyofsystematicassessmentofconstructioninterfaces AT chénmǐnzhèng preliminarystudyofsystematicassessmentofconstructioninterfaces AT chenmincheng gōngchéngguǎnlǐjièmiànwèntíxìtǒnghuàpínggūchūtàn AT chénmǐnzhèng gōngchéngguǎnlǐjièmiànwèntíxìtǒnghuàpínggūchūtàn |
_version_ |
1718407169138753536 |