Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory
碩士 === 東海大學 === 工業工程與經營資訊學系 === 103 === Taiwan's TFT-LCD plant is mainly to OEM and cost advantages is main competition policy. Therefore it needs the accurate costing. TFT-LCD manufacturing process is complexity, high manufacturing costs. In this research, the manufacturing cost can be objecti...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/30879110802025960383 |
id |
ndltd-TW-103THU00030017 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-103THU000300172016-08-14T04:10:49Z http://ndltd.ncl.edu.tw/handle/30879110802025960383 Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory 時間導向作業基礎成本制應用於TFT-LCD廠之研究 Shin-Jia Chen 陳信嘉 碩士 東海大學 工業工程與經營資訊學系 103 Taiwan's TFT-LCD plant is mainly to OEM and cost advantages is main competition policy. Therefore it needs the accurate costing. TFT-LCD manufacturing process is complexity, high manufacturing costs. In this research, the manufacturing cost can be objectively assessed to each product by Time-Driven Activity-Based Costing (TDABC) method. The use of Activity-Based Management (ABM) will be converted manufacturing cost to information as a basis for cost improvement and pricing. At the same time applying Business Intelligence (BI) and using time equation solve complex manufacturing process, and establish cost measurement system which is structured and easy to update and maintain. The machine are the unit to connect the whole process in this research. First, the accounting ledger organized into resource costs applicable to ABC. The resource costs using the right resources driver allocate to the machine. According to the resources of the machine using aggregated total operating costs and time of machine utilizing to set cost per time unit. The number of product through the machine and the machine actual operating time are the main variables of TDABC’s time equation. AS the basis of time calculation in the array reflow process. Products process time can be derived. Unit cost multiplied by the product process time to obtain the product cost. The results show that the above steps can have a systematic guide TDABC to TFT-LCD manufacturers, but also provide effective cost information to manager and allows cost measurement system is easy to update and maintain. Jau-Shin Hon 洪堯勳 2015 學位論文 ; thesis 73 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 東海大學 === 工業工程與經營資訊學系 === 103 === Taiwan's TFT-LCD plant is mainly to OEM and cost advantages is main competition policy. Therefore it needs the accurate costing. TFT-LCD manufacturing process is complexity, high manufacturing costs. In this research, the manufacturing cost can be objectively assessed to each product by Time-Driven Activity-Based Costing (TDABC) method. The use of Activity-Based Management (ABM) will be converted manufacturing cost to information as a basis for cost improvement and pricing. At the same time applying Business Intelligence (BI) and using time equation solve complex manufacturing process, and establish cost measurement system which is structured and easy to update and maintain. The machine are the unit to connect the whole process in this research. First, the accounting ledger organized into resource costs applicable to ABC. The resource costs using the right resources driver allocate to the machine. According to the resources of the machine using aggregated total operating costs and time of machine utilizing to set cost per time unit. The number of product through the machine and the machine actual operating time are the main variables of TDABC’s time equation. AS the basis of time calculation in the array reflow process. Products process time can be derived. Unit cost multiplied by the product process time to obtain the product cost. The results show that the above steps can have a systematic guide TDABC to TFT-LCD manufacturers, but also provide effective cost information to manager and allows cost measurement system is easy to update and maintain.
|
author2 |
Jau-Shin Hon |
author_facet |
Jau-Shin Hon Shin-Jia Chen 陳信嘉 |
author |
Shin-Jia Chen 陳信嘉 |
spellingShingle |
Shin-Jia Chen 陳信嘉 Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory |
author_sort |
Shin-Jia Chen |
title |
Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory |
title_short |
Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory |
title_full |
Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory |
title_fullStr |
Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory |
title_full_unstemmed |
Implementation of Time-Driven Activity-Based Costing In TFT-LCD Factory |
title_sort |
implementation of time-driven activity-based costing in tft-lcd factory |
publishDate |
2015 |
url |
http://ndltd.ncl.edu.tw/handle/30879110802025960383 |
work_keys_str_mv |
AT shinjiachen implementationoftimedrivenactivitybasedcostingintftlcdfactory AT chénxìnjiā implementationoftimedrivenactivitybasedcostingintftlcdfactory AT shinjiachen shíjiāndǎoxiàngzuòyèjīchǔchéngběnzhìyīngyòngyútftlcdchǎngzhīyánjiū AT chénxìnjiā shíjiāndǎoxiàngzuòyèjīchǔchéngběnzhìyīngyòngyútftlcdchǎngzhīyánjiū |
_version_ |
1718375543086252032 |