Developing the Initial Execution Plan of BIM Implementation for Operations Management

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 103 === Facility management (FM) has become an important work during the operation phase of the construction life cycle. Managing facilities effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D...

Full description

Bibliographic Details
Main Authors: Chia-Chun Hong, 洪佳君
Other Authors: Yu-Cheng Lin
Format: Others
Online Access:http://ndltd.ncl.edu.tw/handle/636r66
id ndltd-TW-103TIT05653044
record_format oai_dc
spelling ndltd-TW-103TIT056530442019-07-09T13:47:35Z http://ndltd.ncl.edu.tw/handle/636r66 Developing the Initial Execution Plan of BIM Implementation for Operations Management BIM導入營運維護管理 前置作業規劃之研究 Chia-Chun Hong 洪佳君 碩士 國立臺北科技大學 土木與防災研究所 103 Facility management (FM) has become an important work during the operation phase of the construction life cycle. Managing facilities effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building Information Modeling (BIM) technologies uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This study proposes and develops an initial execution plan of BIM implementation for maintenance management especially at early stage of operation and maintenance phase. With the application of proposed BIM execution plan, the implementation of BIM technologies can be effective in the operation and maintenance phase. The proposed Initial BIM execution plan is then applied in selected case studies in Taiwan to verify the proposed methodology and demonstrate its effectiveness in practice. Finally, this study identifies the benefits, limitations, and facing problems with applying the initial plan of BIM implementation through the two real cases. Finally, conclusion and suggestion are summarized for further applications. The combined results demonstrate that a proposed initial execution plan of BIM implementation can be an effective execution approach for improving FM work efficiency integrated with BIM technologies. Yu-Cheng Lin 林祐正 學位論文 ; thesis 0
collection NDLTD
format Others
sources NDLTD
description 碩士 === 國立臺北科技大學 === 土木與防災研究所 === 103 === Facility management (FM) has become an important work during the operation phase of the construction life cycle. Managing facilities effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building Information Modeling (BIM) technologies uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This study proposes and develops an initial execution plan of BIM implementation for maintenance management especially at early stage of operation and maintenance phase. With the application of proposed BIM execution plan, the implementation of BIM technologies can be effective in the operation and maintenance phase. The proposed Initial BIM execution plan is then applied in selected case studies in Taiwan to verify the proposed methodology and demonstrate its effectiveness in practice. Finally, this study identifies the benefits, limitations, and facing problems with applying the initial plan of BIM implementation through the two real cases. Finally, conclusion and suggestion are summarized for further applications. The combined results demonstrate that a proposed initial execution plan of BIM implementation can be an effective execution approach for improving FM work efficiency integrated with BIM technologies.
author2 Yu-Cheng Lin
author_facet Yu-Cheng Lin
Chia-Chun Hong
洪佳君
author Chia-Chun Hong
洪佳君
spellingShingle Chia-Chun Hong
洪佳君
Developing the Initial Execution Plan of BIM Implementation for Operations Management
author_sort Chia-Chun Hong
title Developing the Initial Execution Plan of BIM Implementation for Operations Management
title_short Developing the Initial Execution Plan of BIM Implementation for Operations Management
title_full Developing the Initial Execution Plan of BIM Implementation for Operations Management
title_fullStr Developing the Initial Execution Plan of BIM Implementation for Operations Management
title_full_unstemmed Developing the Initial Execution Plan of BIM Implementation for Operations Management
title_sort developing the initial execution plan of bim implementation for operations management
url http://ndltd.ncl.edu.tw/handle/636r66
work_keys_str_mv AT chiachunhong developingtheinitialexecutionplanofbimimplementationforoperationsmanagement
AT hóngjiājūn developingtheinitialexecutionplanofbimimplementationforoperationsmanagement
AT chiachunhong bimdǎorùyíngyùnwéihùguǎnlǐqiánzhìzuòyèguīhuàzhīyánjiū
AT hóngjiājūn bimdǎorùyíngyùnwéihùguǎnlǐqiánzhìzuòyèguīhuàzhīyánjiū
_version_ 1719221622824501248