Environmental Impact Assessment and Its Reduction Strategy on Both Planing Design and Construction Stages- Case Study of Pipe-Jacking
碩士 === 國立臺北科技大學 === 土木工程系土木與防災碩士班(碩士在職專班) === 103 === Due to the crisis brought by climate change and limited resources, all of the industries need to find out the source and solutions against global warming and greenhouse effect. For example, Taiwan’s carbon emissions was ranked 27th of the world i...
Main Authors: | Chen-Yang Chang, 張晨揚 |
---|---|
Other Authors: | Li-Hsien Chen |
Format: | Others |
Online Access: | http://ndltd.ncl.edu.tw/handle/7scs69 |
Similar Items
-
Investigation and Reengineering in Pipe jacking Construction Process
by: Chi-ming Liu, et al.
Published: (2009) -
Physical Modelling and Numerical of PipeJacking
by: Funwei Chang, et al.
Published: (2002) -
A Complex Variable Solution for Rectangle Pipe Jacking in Elastic Half-Plane
by: Xin-yuan Li, et al.
Published: (2017-01-01) -
Study on the jacking force for curved pipe jacking
by: Jian-Ming Jiang, et al.
Published: (2009) -
A Study on Scheduling Strategy for Pipe-Jack
by: Zoe Lee, et al.
Published: (2011)