A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge

碩士 === 真理大學 === 企業管理學系碩士班 === 105 === With the recent election of new Taipei City and a variety of political views put forward, The elections politics have been proposed past three decades,government After coordinating the various views of different parties, Finally approved in 2010, Danjiang Bridge...

Full description

Bibliographic Details
Main Authors: YANG,BIN-JAY, 楊秉捷
Other Authors: HUANG,CHI-CHENG
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/66qv77
id ndltd-TW-104AU000163007
record_format oai_dc
spelling ndltd-TW-104AU0001630072019-05-15T23:09:59Z http://ndltd.ncl.edu.tw/handle/66qv77 A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge 公共建設之多準則決策分析-以淡江大橋為例 YANG,BIN-JAY 楊秉捷 碩士 真理大學 企業管理學系碩士班 105 With the recent election of new Taipei City and a variety of political views put forward, The elections politics have been proposed past three decades,government After coordinating the various views of different parties, Finally approved in 2010, Danjiang Bridge planning feasibility report by the Executive Yuan. Danjiang Bridge is the third largest landscape Bridge across the Taiwan river estuary the Tamsui River, is the second seat rail tracks and roads configuration of the Taiwan bridge, the bridge in Republic of China, New Taipei City, the Bridge to link Tamsui District and Bali District In the late 1980s proposed the construction plan, Executive Yuan on April 2, 2010 approved the feasibility Danjiang Bridge Planning Report, Total length of about 12.08 km, Contains the main bridge 900 meters and both ends of the connecting taxiway, belongs viaducts. All parties advocated factors, nothing more than to urban prosperity, environmental conservation, government interest Technical capacity, will affect the actual effectiveness of the project will be progress. In this study, using Analytic Hierarchy Process to Public Works for evaluating Decision Analysis, Proposed a variety of objectives Indicators Questionnaire: (1) profit (2)public goals (3) complexity (4) requirements of (5) delayed (6) Transportation interest (7) urban development interests (8) construction costs (9)operating costs. Research findings will provide future decisions related to public construction analysis reference. HUANG,CHI-CHENG 黃啟誠 2016 學位論文 ; thesis 90 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 真理大學 === 企業管理學系碩士班 === 105 === With the recent election of new Taipei City and a variety of political views put forward, The elections politics have been proposed past three decades,government After coordinating the various views of different parties, Finally approved in 2010, Danjiang Bridge planning feasibility report by the Executive Yuan. Danjiang Bridge is the third largest landscape Bridge across the Taiwan river estuary the Tamsui River, is the second seat rail tracks and roads configuration of the Taiwan bridge, the bridge in Republic of China, New Taipei City, the Bridge to link Tamsui District and Bali District In the late 1980s proposed the construction plan, Executive Yuan on April 2, 2010 approved the feasibility Danjiang Bridge Planning Report, Total length of about 12.08 km, Contains the main bridge 900 meters and both ends of the connecting taxiway, belongs viaducts. All parties advocated factors, nothing more than to urban prosperity, environmental conservation, government interest Technical capacity, will affect the actual effectiveness of the project will be progress. In this study, using Analytic Hierarchy Process to Public Works for evaluating Decision Analysis, Proposed a variety of objectives Indicators Questionnaire: (1) profit (2)public goals (3) complexity (4) requirements of (5) delayed (6) Transportation interest (7) urban development interests (8) construction costs (9)operating costs. Research findings will provide future decisions related to public construction analysis reference.
author2 HUANG,CHI-CHENG
author_facet HUANG,CHI-CHENG
YANG,BIN-JAY
楊秉捷
author YANG,BIN-JAY
楊秉捷
spellingShingle YANG,BIN-JAY
楊秉捷
A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge
author_sort YANG,BIN-JAY
title A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge
title_short A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge
title_full A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge
title_fullStr A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge
title_full_unstemmed A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge
title_sort multiple criteria decision analysis of public infrastructure-an example of dan jiang bridge
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/66qv77
work_keys_str_mv AT yangbinjay amultiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge
AT yángbǐngjié amultiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge
AT yangbinjay gōnggòngjiànshèzhīduōzhǔnzéjuécèfēnxīyǐdànjiāngdàqiáowèilì
AT yángbǐngjié gōnggòngjiànshèzhīduōzhǔnzéjuécèfēnxīyǐdànjiāngdàqiáowèilì
AT yangbinjay multiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge
AT yángbǐngjié multiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge
_version_ 1719141895585660928