A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge
碩士 === 真理大學 === 企業管理學系碩士班 === 105 === With the recent election of new Taipei City and a variety of political views put forward, The elections politics have been proposed past three decades,government After coordinating the various views of different parties, Finally approved in 2010, Danjiang Bridge...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/66qv77 |
id |
ndltd-TW-104AU000163007 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-104AU0001630072019-05-15T23:09:59Z http://ndltd.ncl.edu.tw/handle/66qv77 A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge 公共建設之多準則決策分析-以淡江大橋為例 YANG,BIN-JAY 楊秉捷 碩士 真理大學 企業管理學系碩士班 105 With the recent election of new Taipei City and a variety of political views put forward, The elections politics have been proposed past three decades,government After coordinating the various views of different parties, Finally approved in 2010, Danjiang Bridge planning feasibility report by the Executive Yuan. Danjiang Bridge is the third largest landscape Bridge across the Taiwan river estuary the Tamsui River, is the second seat rail tracks and roads configuration of the Taiwan bridge, the bridge in Republic of China, New Taipei City, the Bridge to link Tamsui District and Bali District In the late 1980s proposed the construction plan, Executive Yuan on April 2, 2010 approved the feasibility Danjiang Bridge Planning Report, Total length of about 12.08 km, Contains the main bridge 900 meters and both ends of the connecting taxiway, belongs viaducts. All parties advocated factors, nothing more than to urban prosperity, environmental conservation, government interest Technical capacity, will affect the actual effectiveness of the project will be progress. In this study, using Analytic Hierarchy Process to Public Works for evaluating Decision Analysis, Proposed a variety of objectives Indicators Questionnaire: (1) profit (2)public goals (3) complexity (4) requirements of (5) delayed (6) Transportation interest (7) urban development interests (8) construction costs (9)operating costs. Research findings will provide future decisions related to public construction analysis reference. HUANG,CHI-CHENG 黃啟誠 2016 學位論文 ; thesis 90 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 真理大學 === 企業管理學系碩士班 === 105 === With the recent election of new Taipei City and a variety of political views put forward, The elections politics have been proposed past three decades,government After coordinating the various views of different parties, Finally approved in 2010, Danjiang Bridge planning feasibility report by the Executive Yuan.
Danjiang Bridge is the third largest landscape Bridge across the Taiwan river estuary the Tamsui River, is the second seat rail tracks and roads configuration of the Taiwan bridge, the bridge in Republic of China, New Taipei City, the Bridge to link Tamsui District and Bali District
In the late 1980s proposed the construction plan, Executive Yuan on April 2, 2010 approved the feasibility Danjiang Bridge Planning Report, Total length of about 12.08 km, Contains the main bridge 900 meters and both ends of the connecting taxiway, belongs viaducts.
All parties advocated factors, nothing more than to urban prosperity, environmental conservation, government interest
Technical capacity, will affect the actual effectiveness of the project will be progress.
In this study, using Analytic Hierarchy Process to Public Works for evaluating Decision Analysis, Proposed a variety of objectives Indicators Questionnaire: (1) profit (2)public goals (3) complexity (4) requirements of (5) delayed (6) Transportation interest (7) urban development interests (8) construction costs (9)operating costs.
Research findings will provide future decisions related to public construction analysis reference.
|
author2 |
HUANG,CHI-CHENG |
author_facet |
HUANG,CHI-CHENG YANG,BIN-JAY 楊秉捷 |
author |
YANG,BIN-JAY 楊秉捷 |
spellingShingle |
YANG,BIN-JAY 楊秉捷 A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge |
author_sort |
YANG,BIN-JAY |
title |
A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge |
title_short |
A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge |
title_full |
A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge |
title_fullStr |
A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge |
title_full_unstemmed |
A Multiple Criteria Decision Analysis of Public Infrastructure-An Example of Dan Jiang Bridge |
title_sort |
multiple criteria decision analysis of public infrastructure-an example of dan jiang bridge |
publishDate |
2016 |
url |
http://ndltd.ncl.edu.tw/handle/66qv77 |
work_keys_str_mv |
AT yangbinjay amultiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge AT yángbǐngjié amultiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge AT yangbinjay gōnggòngjiànshèzhīduōzhǔnzéjuécèfēnxīyǐdànjiāngdàqiáowèilì AT yángbǐngjié gōnggòngjiànshèzhīduōzhǔnzéjuécèfēnxīyǐdànjiāngdàqiáowèilì AT yangbinjay multiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge AT yángbǐngjié multiplecriteriadecisionanalysisofpublicinfrastructureanexampleofdanjiangbridge |
_version_ |
1719141895585660928 |