Study on the Construction Engineering Controversial Case

碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士在職專班 === 104 === Build plant facilities for the past period and the owners often nothing more than because of the large amount of friction caused generally believed to create rich profit, to create a project too professional, too many vendors on the market of non-majo...

Full description

Bibliographic Details
Main Authors: Tien Chung Kai, 田中凱
Other Authors: 陳鴻輝
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/36010930582527507497
Description
Summary:碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士在職專班 === 104 === Build plant facilities for the past period and the owners often nothing more than because of the large amount of friction caused generally believed to create rich profit, to create a project too professional, too many vendors on the market of non-majors in college, start and end time the rope length, owners often due to different external opinions and inconstant, builders and owners a thorough regulatory and contractual know enough, causing the two sides interpret differently. In this study, plant and create friction with the owners, and even cause the two sides broke up, the owners suspect that builders overstated the cost, to create a commercial center construction finally unable to obtain the balance due. Although multiparty past research, and solutions, but most could not reach the perfect result. This study is the result, the company encountered problems I refer Taoyuan District Court verdict, sorting out some of the industry tend to ignore the problem, to be reminded.