Study on the Construction Engineering Controversial Case

碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士在職專班 === 104 === Build plant facilities for the past period and the owners often nothing more than because of the large amount of friction caused generally believed to create rich profit, to create a project too professional, too many vendors on the market of non-majo...

Full description

Bibliographic Details
Main Authors: Tien Chung Kai, 田中凱
Other Authors: 陳鴻輝
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/36010930582527507497
id ndltd-TW-104MHIT1015004
record_format oai_dc
spelling ndltd-TW-104MHIT10150042017-10-01T04:29:45Z http://ndltd.ncl.edu.tw/handle/36010930582527507497 Study on the Construction Engineering Controversial Case 營建工程爭議的案例研究 Tien Chung Kai 田中凱 碩士 明新科技大學 土木工程與環境資源管理系碩士在職專班 104 Build plant facilities for the past period and the owners often nothing more than because of the large amount of friction caused generally believed to create rich profit, to create a project too professional, too many vendors on the market of non-majors in college, start and end time the rope length, owners often due to different external opinions and inconstant, builders and owners a thorough regulatory and contractual know enough, causing the two sides interpret differently. In this study, plant and create friction with the owners, and even cause the two sides broke up, the owners suspect that builders overstated the cost, to create a commercial center construction finally unable to obtain the balance due. Although multiparty past research, and solutions, but most could not reach the perfect result. This study is the result, the company encountered problems I refer Taoyuan District Court verdict, sorting out some of the industry tend to ignore the problem, to be reminded. 陳鴻輝 2016 學位論文 ; thesis 71 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 明新科技大學 === 土木工程與環境資源管理系碩士在職專班 === 104 === Build plant facilities for the past period and the owners often nothing more than because of the large amount of friction caused generally believed to create rich profit, to create a project too professional, too many vendors on the market of non-majors in college, start and end time the rope length, owners often due to different external opinions and inconstant, builders and owners a thorough regulatory and contractual know enough, causing the two sides interpret differently. In this study, plant and create friction with the owners, and even cause the two sides broke up, the owners suspect that builders overstated the cost, to create a commercial center construction finally unable to obtain the balance due. Although multiparty past research, and solutions, but most could not reach the perfect result. This study is the result, the company encountered problems I refer Taoyuan District Court verdict, sorting out some of the industry tend to ignore the problem, to be reminded.
author2 陳鴻輝
author_facet 陳鴻輝
Tien Chung Kai
田中凱
author Tien Chung Kai
田中凱
spellingShingle Tien Chung Kai
田中凱
Study on the Construction Engineering Controversial Case
author_sort Tien Chung Kai
title Study on the Construction Engineering Controversial Case
title_short Study on the Construction Engineering Controversial Case
title_full Study on the Construction Engineering Controversial Case
title_fullStr Study on the Construction Engineering Controversial Case
title_full_unstemmed Study on the Construction Engineering Controversial Case
title_sort study on the construction engineering controversial case
publishDate 2016
url http://ndltd.ncl.edu.tw/handle/36010930582527507497
work_keys_str_mv AT tienchungkai studyontheconstructionengineeringcontroversialcase
AT tiánzhōngkǎi studyontheconstructionengineeringcontroversialcase
AT tienchungkai yíngjiàngōngchéngzhēngyìdeànlìyánjiū
AT tiánzhōngkǎi yíngjiàngōngchéngzhēngyìdeànlìyánjiū
_version_ 1718541300121206784