A Case Study on the Shift Scheduling at an IC Final Testing Factory

碩士 === 國立交通大學 === 管理學院資訊管理學程 === 104 === This research considers the construction of shift scheduling model for the IC final testing factory in wafer fabrication as a case study, whose properties are similar to make-to-order OEM service. Not only for long hours of labor industry, because of the prev...

Full description

Bibliographic Details
Main Authors: Hsieh,Yu-Lung, 謝育倫
Other Authors: Lin,Bertrand Miao-Tsong
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/7485kd